![RadiSys PROMENTUM ATCA-2210 Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/radisys/promentum-atca-2210/promentum-atca-2210_installation-manual_780548004.webp)
Installation Guide
4
SCM installation checklist
The following table describes the possible installation scenarios for the SCM, the appropriate tasks to
complete for the scenarios, and the order to complete the tasks:
SCM is being.....
Configuration
Tasks to complete and order to complete them
Installed in a RadiSys shelf
Standard configuration.
1.
Install the SCM in the shelf
on page 5
2.
Connect to the SCM
on page 6
3.
Verify switch operation
on page 7
4.
Verify shelf management operation
on page 10
____
____
____
____
Installed in a non-RadiSys
shelf
Post-installation configuration required:
After installation of the SCM in the
non-RadiSys shelf, you must disable the
SCM’s on-board Shelf Manager.
1.
Install the SCM in the shelf
on page 5
2.
Disable the Shelf Manager on the SCM
on page 10
3.
Verify switch operation
on page 7
____
____
____
Removed from a non-RadiSys
shelf and reinstalled in a
RadiSys shelf
Pre-removal configuration required:
Before you remove the SCM from the
non-RadiSys shelf,
you must enable the
SCM’s on-board Shelf Manager.
1.
Enable the Shelf Manager on the SCM
on page 12
2. Remove the SCM from the non-RadiSys shelf. For
SCM removal instructions, see the
ATCA-2210 Switch
and Control Reference
.
3.
Install the SCM in the shelf
on page 5
4.
Connect to the SCM
on page 6
5.
Verify switch operation
on page 7
6.
Verify shelf management operation
on page 10
____
____
____
____
____
____