7.2. Starting the operation of the biomass boiler
-
Boiler connected to the hydraulic system.
-
Drill a 4 mm diameter hole in the upper side of the flue in a zone very close to the boiler
flue exit. * Only for TKAN 80 Integra and TKAN 100 Integra
-
Make sure that the pellet transport mechanism is firmly supported on the floor, that the
fan flap is maximally open, in cases where the fan is with a flap.
-
The position of the safety air damper guides is shown in the figure. Position is important
in the nominal operation of the boiler.
Picture 21. Fan valve position
* only for TKAN 80 Integra and TKAN 100 Integra
Picture 22. Valve guide position during nominal operation
-TKAN Integra 80 i 100: hole length 51mm
-TKAN Integra 150: the length of the opening is maximum
-TKAN Integra 200: the length of the opening is maximum
-TKAN Integra 250: the length of the hole is 45mm
-TKAN Integra 300: the length of the hole is 45mm
-
Bring the power supply to the main distribution cabinet on the boiler. Place the main
comb disconnector in position 1.
-
Pour the pellets into the silo and close it.
Содержание TKAN Integra Series
Страница 25: ...25 Slika 14 Brzi pristup nekim funkcijama sistema Slika 15 Rad sistema bez gre ke...
Страница 27: ...27 Slika 18 Prikaz funkcija ekrana...
Страница 71: ...71 Picture 14 Quick access to some system functions Picture 15 System operating without error...
Страница 73: ...73 Picture 18 Display screen functions...