Radijator Inženjering d.o.o, 36000 Kraljevo, Živojina Lazića - Solunca br.6, Srbija
tel. +381 36 399 140, fax. +381 36 399 150, http://www.radijator.rs
e-mail: [email protected]
68
9. Warranty
8.
Radijator inženjering covers the warranty period of 60 MONTHS only if following warranty
conditions are fulfilled:
8.1.
The boiler must be connected according to the technical diagrams given in technical
instructions; special attention should be paid to safety valves, thermal safety by draining,
mixing valve for protection of cold end of the boiler, i.e. for protection against condensation,
boiler operating pressure range, boiler operating temperature range, conditions in the boiler
room etc.
(See items 3 and 6)
8.2.
The boiler must be connected to the chimney with prescribed cross-section, insulation and
height.
(see item 3.4)
8.3.
The uptake from boiler to the chimney must be done according to the technical instructions.
8.4.
The owner must follow stated instructions for use and maintenance.
(See items 7.1 and 7.2)
9.
Warranty declaration
We declare:
that the product has prescribed and declared quality characteristics.
We are obliged, at the request of the buyer if such request for repair is submitted in due time
and in the warranty period, at our expense, to carry out all repairs of damages, in such way that
the product will operate in accordance with declared characteristics,
that the product will operate without fault during the warranty period if all the instructions for
use, operation and installation are followed,
that in the warranty period we will be ready to eliminate all damages on the product and keep in
stock all necessary spare parts,
the warranty period starts from the DAY OF PURCHASE AND LASTS 60 MONTHS OR
72 MONTHS FROM THE DATE OF MANUFACTURE (date of manufacture is specified
on the label on the back side of the boiler)
the warranty is valid if the warranty card is stamped by the seller and if date of purchase
is written on it and the bill is enclosed.
10.
Warranty period of one year is valid for the following parts:
bricks in the firebox,
Automation system of the ECOREG 1750 boiler and the sensor regularly delivered with the
automation system (flue gas temperature sensor, sensor for temperature of water in the boiler,