!
Solid fuel boiler and forced draft should be installed according to valid
standards and legal regulations. Any mechanical or electrical change in the design or
installation shall be deemed a violation of guarantee conditions and will lead to its
distortion.
!
When transporting or irresponsible manipulation of the spare parts, if there is a
shock in the circuit that is used for kindling likely the damage of the ceramic heater. These
damages are not subject to warranty.
!
When any intervention on the electrical devices Biomaxa, the whole system off
the main power supply.
The basic requirements to be complied with during the installation
:
-
The boiler can be connected to an open system of central heating, but also to a closed
system of central heating. In case of connection to a closed system, it is recommended to
install the valve for thermal insurance, which is determined by the respective laws of
each state in which the boiler is connected.
-
The boiler must be located at a safe distance from combustible materials.
-
The boiler must be far enough from possible obstacles in the boiler room for cleaning and
maintenance.See figure 9.
-
Electric power for the Boiler is 230V 50Hz and connection of all devicesthat the boiler
has should be done according to valid regulations and connection is done by a person
with proper authority.
-
Connection to the chimney also done according to the binding regulations and
manufacturer's recommendations as can be seen below
.
Содержание BIOmax Series
Страница 16: ...1 2 4 Presek TKAN kotla sa opisom elemenata slika 11 Presek kotla TKAN BIOmax 3 4 5 6 7 8 11 9 10 12 ...
Страница 18: ...5 Šema vezivanja automatike ...
Страница 21: ...7 Hidraulična šema ...
Страница 41: ...Figure2 Parts of boiler Discription 1 Body of boiler 2 Combustion chamber 3 Feeder 4 Silos 5 Ashtray ...
Страница 54: ...5 Schematic connection of automation ...
Страница 57: ...7 Hydraulic scheme ...
Страница 74: ......