 GENERAL INSTALLATION REQUIREMENTS 

 

GAS SAFETY 

 

It is the law that all gas appliances are installed by a CORGI registered installer in accordance with the regulations listed below.  

Failure to install appliances correctly could lead to prosecution.  It is in your own interest and that of safety to ensure that the 

law is complied with.  Failure to have your appliance installed to comply with the installation instructions and the requirements 

listed below could invalidate your guarantee. 
 

RELATED DOCUMENTS 

The installation of the boiler must be in accordance with the relevant requirements of the Gas Safety regulations, Building 

regulations, I.E.E. regulations and the byelaws of the local water authority. 

It should be in accordance also with any relevant requirements of the local authority and the relevant recommendations of the 

following British Standard Codes of Practice: 
 

 

B.S 6400: 

1985  & B.S. 6891 : 1988. 

 

BS 5376: 

Selection and Installation of Gas Space Heating ( 1 and 2 family gases) 

 

 

Part 2: Boilers of rated input not exceeding 60 Kw 

 

BS 5449: 

Central Heating for domestic premises 

 

 

Part 1: Forced circulation Hot Water System 

 

CP 342: 

Centralised Hot Water Supply BS 6700 :  1987 

 

 

Part 2: Buildings other than individual 

 

BS 5440: 

Flues and air supply for Gas Appliances of rated input not exceeding 

 

 

60 Kw (1 and 2 family gases) 

  

Part 

1: 

Flues 

 

 

Part 2: Air Supply 

 

BS 5446: 

1990:   

Installation of Gas Hot Water supplies for domestic purposes 

 

GAS SUPPLY 

Service Pipes:  The local gas region should be consulted at the installation planning stage in order to establish the availability of 
supply of gas.  An existing service pipe must not be used without prior consultation with the local gas region. 

Meters:  A gas meter is connected to the service pipe by the local gas region or local gas region contractor. An existing meter 

should be checked to ensure that it is capable of passing an additional 3.4 m3/hr (125 ft/hr)  before the appliance is installed.  

The meter outlet governor should ensure a nominal dynamic pressure of 20m Bar, (8 in wg) at the boiler.  Installation pipes 

should be fitted in accordance with BS6891.1988.  Pipework from the meter to the boiler must be 22mm copper tube. The 

complete installation must be tested for soundness as described in the above code, BS 6400: 1985 & BS6891. 
 

IMPORTANT:  BOTH THE USER AND THE MANUFACTURER RELY UPON THE INSTALLER, WHOSE JOB IS TO INSTALL 

THE BOILER AND CONNECT IT TO A CORRECTLY DESIGNED HEATING SYSTEM.  THE INSTALLER SHOULD 

ACQUAINT HIMSELF WITH THE CONTENTS OF THIS PUBLICATION AND THE RELEVANT BRITISH STANDARDS 

CONCERNING INSTALLATION REQUIREMENTS. 
 

LOCATION OF BOILER 

In siting the combination boiler, the following limitations MUST be observed: 

The position selected for installation should be within the building, and MUST allow  

adequate space for installation, servicing and operation of the combination boiler, and for air circulation around it. The boiler is 
not suitable for external installation. 

This position MUST also allow for a suitable flue termination to be made.  The boiler must be installed on a flat vertical wall 

which is capable of supporting the weight of the combination boiler, and any ancillary equipment. 

If  the boiler is to be fitted in a timber framed building it should be fitted in accordance with the British Gas publication "Guide for 

Gas Installations in Timber Frame Housing, Reference DM2". If in doubt, advice must be sought from the local  region of British 

Gas. 
The boiler may be installed in any room or internal space, although particular attention is drawn to the requirements of the 

current I.E.E. Wiring Regulations, and in Scotland the electrical provisions of the Building Regulations applicable in Scotland, 

with respect to the installation of the boiler in a room or internal space containing a bath or shower. 

Where a room-sealed appliance is installed in a room containing a bath or shower, any electrical switch or appliance control 

utilising mains electricity must be so situated that it cannot be touched by a person using the bath or shower. 
A compartment used to enclose the combination boiler MUST be designed and constructed specifically for this purpose.  An 

existing cupboard, or compartment, may be used provided it is modified accordingly. 

Содержание RMA

Страница 1: ...BRUCIATORI S p A Montelabbate PU ITALY By Technical Department INSTALLATION USE AND MAINTENANCE MANUAL FOR GAS FIRED WALL HUNG BOILERS WITH DOMESTIC HOT WATER STORAGE CYLINDER Model RMA TYPE B OPEN C...

Страница 2: ......

Страница 3: ...REQUIREMENTS page 6 BOILER INSTALLATION page 8 ELECTRICAL CONNECTIONS page 10 19 22 BOILER CONTROL PANEL page 11 STARTING UP THE BOILER FOR THE FIRST TIME page 11 BOILER ADJUSTMENTS page 13 MULTIGAS O...

Страница 4: ...ADDING AN OPTIONAL TIMER SELF DIAGNOSTIC LEGEND see fig 2 6 OPERATING POWER INDICATOR 7 DOMESTIC HOT WATER OPERATION 8 HEATING OPERATION 9 FLASHING LIGHT DENOTING AIR PRESSURE SWITCH FAILURE 10 FLASH...

Страница 5: ...re range can be adjusted from a minimum of 30 C to a maximum of 80 C REGULATING THE HOT WATER TEMPERATURE The hot water temperature is regulated by turning knob 4 see fig 1 pag I turn it counter clock...

Страница 6: ...mogeneous highly functional unit that is easy to install and simple to operate The wall mounted boiler is equipped with all of the approved accessories required to make it a true independent heating p...

Страница 7: ...ating unit has been constructed to heat the home and to produce hot water The constructor declines all responsibility for incorrect installation and or use of the device Do not leave the device on whe...

Страница 8: ...KCal h 22950 23090 Kw 26 68 26 85 BTU h 91066 91621 Minimum rated output KCal h 12950 12900 Kw 15 06 15 BTU h 51386 51187 Heting temperature adjustment C 30 80 30 80 Max working pressure heating bar 3...

Страница 9: ...ength by 0 8 m Kit B Double exhaust emission twin flue system with 360 rotation It allows the flue exhaust into a flue duct and the air intake directly from an external wall To insert a bend reduce to...

Страница 10: ...ust fans into single chimney collective flues with natural draft or multiple combined flues follow the directions set out in the UNI 10640 standard CONNECTION OF FLUE PIPES All boilers must be connect...

Страница 11: ...should ensure a nominal dynamic pressure of 20m Bar 8 in wg at the boiler Installation pipes should be fitted in accordance with BS6891 1988 Pipework from the meter to the boiler must be 22mm copper t...

Страница 12: ...r sources of natural air infiltration or forced ventilation air conditioning systems If this should occur the appliance MUST BE TURNED OFF IMMEDIATELY and the local gas region consulted Where the lowe...

Страница 13: ...nect pipes and valves as shown in the picture 5 Position the boiler paying attention to hang it to the hanging bracket do not lean the boiler on the JIG and make final connections WATER CONNECTIONS To...

Страница 14: ...5 C Heating sensor and 4 C Hot water sensor and protects the boiler down to 2 C external temperature To protect the internal Radiators a room thermostat or remote control must be fitted NOTE The frost...

Страница 15: ...d with the earth symbol see fig 3 connect the blue wire to the terminal marked with the letter N connect the brown wire to the terminal marked with the letter L CONNECTION OF ROOM THERMOSTAT NOTE use...

Страница 16: ...s no sign of leaks in any case double check by using a soapy solution and eliminate all eventual leaks The checking procedure for the gas burner attachment is carried out with the boiler working make...

Страница 17: ...ignition procedure press release button 2 see fig 1 pag 11 and then try the ignition procedure once again If the boiler does not start press the reset button 2 see fig 1 pag 11 IMPORTANT should the bo...

Страница 18: ...crewdriver for any adjustments Turn clockwise to increase gas pressure to the burner at start up by setting the trimmer to maximum calibration pressure of modulator see page 16 Turn counter clockwise...

Страница 19: ...to suit the type of gas used undo fixing nut 8 on the thin aluminium gas pipe 9 and change the jet g replace the gas setting plate that indicates the type of gas and nominal pressure for the boiler W...

Страница 20: ...biliser Fig B Widen locking clips 2 Fig C Slide out the coil 1 located above the gas valve Fig D Tighten plastic screw 3 by turning it clockwise be careful not to break it Fig E Use a no 17 spanner to...

Страница 21: ...hich when set on the top position towards the valve head allows the boiler operating on the domestic hot water circuit while when set on the low position the boiler operates on the central heating cir...

Страница 22: ...ot water see fig 2 item B fig 3 It allows conversion to hot water even with a minimum hot water demand 2 litres min using an electromagnetic principle with electrical switching by means of a relay The...

Страница 23: ...AUTOMATIC AIR VENT 18 HEATING CIRCUIT 3 bar PRESSURE RELIEF VALVE 19 DRAINING TAP 20 WATER PRESSURE GAUGE 21 WATER PRESSURE SWITCH 22 HEATING SENSOR 23 HOT WATER SENSOR 24 3 WAY DIVERTER VALVE 25 FLOW...

Страница 24: ...IR VENT 17 AUTOMATIC AIR VENT 18 HEATING CIRCUIT 3 bar PRESSURE RELIEF VALVE 19 DRAINING TAP 20 WATER PRESSURE GAUGE 21 WATER PRESSURE SWITCH 22 HEATING SENSOR 23 HOT WATER SENSOR 24 3 WAY DIVERTER VA...

Страница 25: ...5 LED6 RAVI II J2 D2 J3 FA1 C3 R48 C20 R49 R17 R23 R24 R47 R13 C8 J9 C6 C19 C21 C7 R15 R32 C13 R39 R37 R31 41 M9 R62 R61 R57 R16 42 C14 C9 R38 C5 RS1 J20 IC2 R18 IC1 R42 43 GPL 44 J7 46 45 R20 C12 R58...

Страница 26: ...5A 2019 4 PS 5 TS LB 7 6 9 9 8 11 11 10 10 12 12 8 13 EA ER 14 15 P 6 ELECTRONIC TEMPERATURE INDICATOR 54 50 51 53 52 55 56 58 57 RVB RVA RV 2 1 3 7 23 19 24 17 18 22 IG VD R CY CX L 20 5 21 16 4 NET...

Страница 27: ...F CONNECTORS 23 LED5 C6 C7 RS1 R58 R22 R21 4 2 1 3 15 14 22 LED2 LED1 LED3 LED4 RAVI II R31 42 R18 R17 yellow blue R48 FA1 C20 R49 R23 R24 R47 C19 C21 red brown R39 C9 M9 R62 R61 R57 J16 R38 C5 J20 R3...

Страница 28: ...OSTAT FLOWSWITCH MICRO SWITCH M F TS HEATING SENSOR D H WATER SENSOR SR SS 3 WAY DIVERTOR VALVE WIRING CONNECTION ONLY FOR Mod VC6012 VD black black black black brown orange black black M F WATER PRES...

Страница 29: ...water flow rate and temperature When dismantling the boiler casing be careful when removing the side panels after having removed the front panel the front panel is removed by undoing the lower and fr...

Страница 30: ...g 1 on a replace it b re connect or replace it c replace it d change over polarity e make earth connection f fit conversion kit 4 Boiler on temperature rises rapidly and extinguishes flame light 2 fig...

Страница 31: ...08LA 3 BAR PRESSURE RELIEF VALVE 1 2 16 96026LA D H W CYLINDER TEMPERATURE 90 PRESSURE 7BAR SAFETY VALVE 17 20030LA INSULATED 25 LT STORAGE CYLINDER 18 95006LA 10 LT EXPANSION TANK W BRACKET 19 96007L...

Страница 32: ...6 Tel 39 0721 498822 Fax 39 0721 499815 Email tecnico radiant it italia radiant it export radiant it Internet http www radiant it All descriptions and illustrations contained in this leaflet have been...

Отзывы: