9
R1K 24 /B - RAD - ING - Manuale - 1507.1 - R2 G
1 Av
ve
rte
n
ze
gener
ali
pe
r l'in
sta
lla
zio
n
e_
L
oc
ale
ca
ldaia
_
E
N
1. INSTALLATION
INST
ALLER
The device's installation location should be vented
due to the presence of threaded joints on the gas
adduction line (UNI 7129-3: 2008). The location
should be therefore provided with vents as to
ensure air exchange, with output grid in the natural
accumulation area of eventual gas losses.
WARNING
If the temperature in the boiler installation
location goes below -10° centigrades, please fill
the plant with anti-freeze liquid and insert and
electrical resistances kit (see chapter ‘ANTI-FREEZE
PROTECTION’).
1.1.3. REFERENCE LEGISLATION
THE INSTALLER MUST FOLLOW THE DIRECTIVES
BELOW:
› Standards UNI 7129-3: 2008 / 7131 and updates;
› Law dated 9 January 1991 n° 10 and relative
Regulation Implementing (DPR 412/93, modified
by DPR 551/99);
› Dispositions issued by Fire Fighters, local gas
Company and Municipal Regulations.
› Instructions provided by the supplier.