background image

Page 4 

Installation Instructions

Step 3. 

Bracket Locations:

 The figures below and on page 5 depict the locations of the 

bracket for various servers. These figures represent the left side of the rack. 

Steps 4, 5, and 6 describe the mounting of each bracket type.

2U Servers (Mounts two PowerEdge 2450, 2550)

4U Servers (PowerEdge 6450)

5U Servers (PowerEdge 2500)

The "Blue Button" on the front of

the Dell RapidRail aligns here

"059" Brackets

Flush Structural Bracket

The "Blue Button" on the front of

the Dell RapidRail aligns here

The "Blue Button" on the front of

the Dell RapidRail aligns here

Содержание 4UKIT-003BLK

Страница 1: ...2Post Flush Racking System Installation Instructions Kit P N 4UKIT 003BLK for 1U 7U Servers...

Страница 2: ...059 Hardware 8 12 24 Pan Head Screws Cross Brace Hardware 2 12 24 Cage Nuts 2 12 24 Pan Head Screws 059 Adapter Bracket Required for Dell Servers Dell Servers Use the 059 Adapter Brackets to provide s...

Страница 3: ...depths contact RackSolutions for additional reducer brackets Step 2 General Installation Information The gure below shows a typical bracket installation for 2U and 4U servers The exact location of the...

Страница 4: ...rack Steps 4 5 and 6 describe the mounting of each bracket type 2U Servers Mounts two PowerEdge 2450 2550 4U Servers PowerEdge 6450 5U Servers PowerEdge 2500 The Blue Button on the front of the Dell...

Страница 5: ...Servers PowerEdge 2400 7U Servers PowerEdge 4400 6400 7U Servers PowerEdge 7150 The Blue Button on the front of the Dell RapidRail aligns here The Blue Button on the front of the Dell RapidRail align...

Страница 6: ...ews for each bracket Refer to the gures below for bracket orientation and screw locations Refer to Step 3 for bracket location Repeat for the opposite side of the rack Notice the alignment of the brac...

Страница 7: ...to the back of the 2Post uprights using three 12 24 Bolts for each bracket Refer to the gure below for bracket orientation and bolt locations Refer to Step 3 for bracket location Repeat for the oppos...

Страница 8: ...two 12 24 pan Head Screws and two 12 24 Cage Nuts The brace can be installed in any two unused holes across the back of the rack Step 7 Dell Rail Installation Install the Dell Slides and Cable Manage...

Отзывы: