Page 7
Installation Instructions
Step 5.
Attaching the Flush Structural Bracket: Attach the Flush Structural Brackets to the
back of the 2Post uprights using three 12-24 Bolts for each bracket. Refer to the
figure below for bracket orientation and bolt locations. Refer to Step 3 for bracket
location. Repeat for the opposite side of the rack.
Back of Rack
Two 12-24 Bolts at the Top
Flush Structural Bracket
One 12-24 Bolt
At the Bottom