UPC #0941 2-Tier 24" Break Resistant PETG Card Rack
ASSEMBLY INSTRUCTIONS
Revised 07/21/14
Page 1 of 2
PARTS LIST
TOOLS REQUIRED: Flathead Screwdriver (Slatwall)
Drill with 3/8” Drywall Bit & Phillips Screwdriver (Drywall)
A
E
C
G
C
C
A
A
F
F
PART Quantity Reference
Screw Post
2
A
Slatwall Adapters
2
B
#8 - 32 Hex Nuts
2
C
Plastic Wall Toggler
2
D
Philips Head Screws
2
E
D
PARTS BAG
PART Quantity Reference
Rack
1
F
Divider
3
G
B
Align hole in Slatwall Adapter (B) with
back side of hole in Rack (F). Prongs extend
back toward Slatwall and up. Attach using
Screw Post (A) from front and Nut (C)
on back.
Slatwall Assembly
Insert Divider (G) into
Rack (F).
1
G
B
B
2
NOTE: Assemble for EITHER Slatwall or Drywall, not both.