TO 31R2-2TRC207-1
i
TABLE OF CONTENTS
Chapter
Page
LIST OF ILLUSTRATIONS.........................................................................................................................................
IV
LIST OF TABLES..........................................................................................................................................................
V
SAFETY SUMMARY...................................................................................................................................................
VI
FOREWORD.................................................................................................................................................................
IX
CHAPTER 1 GENERAL INFORMATION............................................................................................................1-3
1-1
DESCRIPTION AND PURPOSE................................................................................................................. 1-3
1-1.1
Equipment Function and Purpose ........................................................................................................ 1-3
1-1.2
Equipment Description ........................................................................................................................ 1-3
1-2
LEADING PARTICULARS ......................................................................................................................... 1-5
1-3
CAPABILITIES AND LIMITATIONS........................................................................................................ 1-6
1-4
EQUIPMENT SUPPLIED ............................................................................................................................ 1-7
1-5
EQUIPMENT REQUIRED BUT NOT SUPPLIED..................................................................................... 1-8
1-6
SPECIAL TOOLS AND TEST EQUIPMENT............................................................................................. 1-8
1-7
RELATED TECHNICAL MANUALS......................................................................................................... 1-8
CHAPTER 2 INSTALLATION ...............................................................................................................................2-1
2-1
INTRODUCTION......................................................................................................................................... 2-1
S
ECTION
I. INSTALLATION
LOGISTICS ................................................................................................................ 2-1
2-2
SITE PREPARATION. ................................................................................................................................. 2-1
2-3
UNPACKING AND INSPECTIONS. .......................................................................................................... 2-1
2-4
HOUSING..................................................................................................................................................... 2-3
2-5
RECEIVING DATA. .................................................................................................................................... 2-3
2-6
MATERIAL HANDLING. ........................................................................................................................... 2-3
2-7
CABLES........................................................................................................................................................ 2-4
2-8
BUILDING AND OTHER SUPPORTING STRUCTURES........................................................................ 2-4
S
ECTION
II. INSTALLATION PROCEDURES ......................................................................................................... 2-5
2-9
SPECIAL TOOLS AND EQUIPMENT REQUIRED FOR FIELD INSTALLATION................................ 2-5
2-10
INSTALLATION SEQUENCE .................................................................................................................... 2-5
2-10.1 Antenna/Mast Installation .................................................................................................................... 2-5
2-10.2 Lithium Battery Installation. ................................................................................................................ 2-9
2-10.3 Ground Rod Installation....................................................................................................................... 2-9
2-10.4 External Power Supply......................................................................................................................... 2-9
2-10.5 Diplexer Installation............................................................................................................................. 2-9
2-10.6 Receiver-Transmitter Transceiver Module Installation........................................................................ 2-9
CHAPTER 3 PREPARATION FOR USE AND RESHIPMENT .........................................................................3-1
3-1
INTRODUCTION......................................................................................................................................... 3-1
S
ECTION
I. PREPARATION FOR USE...................................................................................................................... 3-1
3-2
INSPECTION. .............................................................................................................................................. 3-1
3-3
POST-INSTALLATION CHECKOUT. ....................................................................................................... 3-1
3-3.1
Preliminary........................................................................................................................................... 3-1
3-3.2
Alignment and Adjustment. ................................................................................................................. 3-2
3-3.3
Post-Installation Checkout Procedures ................................................................................................ 3-2
S
ECTION
II. PREPARATION FOR RESHIPMENT ................................................................................................... 3-2
3-4
PREPARING UNIT FOR RESHIPMENT.................................................................................................... 3-2
3-5
PACKING. .................................................................................................................................................... 3-3
3-6
HANDLING AND STORAGE. .................................................................................................................... 3-3
3-6.1
Protective Measures for Electrical Connectors. ................................................................................... 3-3
3-6.2
Preparation for Shipment and Storage. ................................................................................................ 3-3
3-6.3
Handling. ............................................................................................................................................. 3-3
CHAPTER 4 OPERATION......................................................................................................................................4-1
S
ECTION
I. CONTROLS AND INDICATORS........................................................................................................... 4-1
4-1
INTRODUCTION......................................................................................................................................... 4-1
Содержание AN/TRC-207
Страница 10: ...TO 31R2 2TRC207 1 viii This page left blank intentionally ...
Страница 13: ...TO 31R2 2TRC207 1 1 1 Figure 1 1 Radio Set AN TRC 207 Sheet 2 of 3 ...
Страница 30: ......
Страница 44: ...TO 31R2 2TRC207 1 4 10 Figure 4 6 Standard BDR Cabling Set up Figure 4 7 BDR Cross Banding Cabling Set up ...
Страница 53: ...TO 31R2 2TRC207 1 5 5 Figure 5 2 Repeater Control Audio CCA A1A2 Functional Block Diagram ...
Страница 54: ...TO 31R2 2TRC207 1 5 6 Figure 5 3 15 Watt Power Amplifier Assembly A1A6 Functional Block Diagram ...
Страница 68: ......
Страница 73: ...TO 31R2 2TRC207 1 7 5 HOW TO USE THE ILLUSTRATED PARTS BREAKDOWN ...
Страница 74: ...TO 31R2 2TRC207 1 7 6 HOW TO USE THE ILLUSTRATED PARTS BREAKDOWN ...
Страница 75: ...TO 31R2 2TRC207 1 7 7 This Page Left Blank Intentionally ...
Страница 76: ...TO 31R2 2TRC207 1 7 8 Section II MAINTENANCE PARTS LIST Figure 7 1 Radio Set AN TRC 207 Sheet 1 of 2 ...
Страница 77: ...TO 31R2 2TRC207 1 7 9 Figure 7 1 Radio Set AN TRC 207 Sheet 2 of 2 ...
Страница 81: ...TO 31R2 2TRC207 1 7 13 Figure 7 2 Bi Directional Repeater Assembly 4101027 501 Sheet 1 of 3 ...
Страница 82: ...TO 31R2 2TRC207 1 7 14 Figure 7 2 Bi Directional Repeater Assembly 4101027 501 Sheet 2 of 3 ...
Страница 83: ...TO 31R2 2TRC207 1 7 15 Figure 7 2 Bi Directional Repeater Assembly 4101027 501 Sheet 3 of 3 ...
Страница 86: ...TO 31R2 2TRC207 1 7 18 This Page Left Blank Intentionally ...
Страница 87: ...TO 31R2 2TRC207 1 7 19 Figure 7 3 Power Amplifier Assembly 15W SS 4100853 501 ...
Страница 94: ...TO 31R2 2TRC207 1 8 2 ...
Страница 95: ...TO 31R2 2TRC207 1 8 3 8 4 blank Figure 8 1 Radio Set AN TRC 207 Interconnection Diagram ...
Страница 96: ......
Страница 98: ......