- 18 -
O
PERATOR
´
S
M
ANUAL
F
ITIS
120 M
9901.00.20EN00 - 05/2015
CAUTION:
Before proceeding to connect the top link, make
sure the space between the implement yoke and
WKHORZHUDUPVRIWKHWUDFWRULVVXI¿FLHQWVRWKDW
there is no possibility of contact between the raised
position and the working position. A second check
PXVWEHSHUIRUPHGLQWKH¿HOGZKHQWKHLPSOHPHQW
is under actual working conditions.
IMPORTANT:
If the coupling head is not horizontal, adjust it with
the turnover cylinder. This will facilitate the hitching
procedure.
5.1.3
Hitching the top link
The connection between the top link and the implement must be
made by means of a ball joint (see
§
Once the lower tractor arms are hitched, check that the hitch
pin is in good condition and that it matches the diameter of the
ball joint and connect the top link in one of the three holes in the
yoke.
Raise the implement as high as possible and make sure there is
no collision with the tractor. The length adjustment of the top link
DQGWKHVHOHFWLRQRIWKHKROHDUHGRQHLQWKH¿HOG
Position the stand in working mode: remove the lynch pin and
rotate the stand to bring it into a horizontal position along the
outer arm of the parallelogram. Do not forget to put back the
lynch pin.
5.1.4 Hydraulic
connections
ʈ
See chapter "6 Hydraulic connections", page 19.
5.1.5
Folding up the support leg
1
2
2
Legend
1 Support
leg
2 Lynch
pin
-
Raise the implement using your tractor's lifting mechanism,
XQWLOWKHVXSSRUWOHJLVOLIWHGRIIWKHJURXQG
-
5HPRYHWKHVDIHW\SLQ
-
Turn up the stand into the location provided for this purpose.
1
2
-
5H¿WWKHVDIHW\SLQ
-
Proceed in reverse order to fold down the support leg.