![RAB Lightcloud LCGATEWAY Скачать руководство пользователя страница 2](http://html.mh-extra.com/html/rab/lightcloud-lcgateway/lightcloud-lcgateway_manual_775677002.webp)
EZPAN EDGELIT PANEL 2X2
INSTALLATION INSTRUCTIONS
Thank you for buying RAB lighting fixtures. Our goal is to design the best quality products to get the job done right. We’d like to hear your comments.
Call the Marketing Department at 888-RAB-1000 or email: [email protected]
TM
CLEANING & MAINTENANCE
CAUTION: Be sure fixture temperature is cool enough to
touch. Do not clean or maintain while fixture is energized.
1. Clean acrylic lens & fixture with non-abrasive cleaning
solution.
2. Do not open fixture to clean the LEDs. Do not touch the
LEDs.
TROUBLESHOOTING
1. Check that the line voltage at fixture is correct. Refer to
wiring directions.
2. Is the fixture grounded properly?
0-10V DIMMABLE WIRING
Universal voltage driver permits operation at 100V thru
277V, 50 or 60 Hz. 0-10V control wires must be rated for
300V minimum. Terminal block accepts input power wires
of 16-18 AWG.
1. Connect LINE supply lead to (L) marked on Terminal Block.
2. Connect COMMON supply lead to (N) marked on Terminal
Block.
3. Connect the GROUND wire to pre-installed Push-in
Connector.
4. Connect DIM+ lead to (DIM+) marked on Terminal Block.
5. Connect DIM- lead to (DIM-) marked on Terminal Block.
Easy Installation & Product Help
Tech Help Line
Call our experts 888 RAB-1000
©2016 RAB LIGHTING Inc.
Northvale, New Jersey 07647 USA
rabweb.com
Visit our website for product info
Answered promptly [email protected]
Note: These instructions do not cover all details or variations in equipment nor do they provide for every possible situation during installation, operation
or maintenance.
EZPAN EDGELIT PANEL 2X2 0616
For 12-14 AWG wire, insert supplied 16 AWG Pigtail wires into
Terminal Block.
1. Connect LINE supply lead to Black Pigtail with wire nut
supplied.
2. Connect COMMON supply lead to white Pigtail with wire
nut supplied.
3. Connect the GROUND wire to Green Pigtail with wire nut
supplied.
4. Connect DIM+ lead to (DIM+) marked on Terminal Block.
5. Connect DIM- lead to (DIM-) marked on Terminal Block.
Содержание Lightcloud LCGATEWAY
Страница 14: ...Welcome LCCONTROL20 D10 Controller 1 844 LIGHTCLOUD 1 844 544 4825 support lightcloud com WE RE HERE TO HELP ...
Страница 15: ......
Страница 16: ......
Страница 28: ......
Страница 47: ...Manual ...
Страница 57: ......