!
ATTENTION
— The device is certified with the enclosed antenna. Any other antenna can exceed the
maximum permitted transmission power.
!
ATTENTION
— The device must not be disassembled. Do not break the seal!
3.3 Equipment Required
Needed to
ID
Item
Deploy
Operate
Update
1
Bridge E
x
x
x
2
Power Cable M12, 5pin, Acoded
x*
x*
x*
3
Ethernet Cable M12/RJ45
x
x
x
4
Network Switch
x
x
5
Ethernet Cable RJ45/RJ45
x
x
* Item not needed if Power over Ethernet (PoE) is used.
3.3.1 Requirements for the Equipment
ID
Item
Requirements
3
Ethernet Cable M12/RJ45
The signal cable for digital input must be routed in the
same cable as the power supply and functional ground if
the line length exceeds 3 meters.
4
Switch
Possibility to disable IGMP Snooping; at least as many
ports as Bridge E devices should be con 2
3. Product Information
Page 4 of 45
Содержание Bridge E
Страница 16: ...6 The update is complete Click Mode to go back to the main page 4 Installation Page 14 of 45 www r3 group...
Страница 43: ...R3 Solutions GmbH Appendix for PCN PCN E 001 PCN Name change EREB to Bridge E 1 ANT 18 AUG 2022 5...
Страница 47: ...R3 Solutions GmbH Appendix for PCN PCN E 002 PCN 2ANT 20 AUG 2022 2...