It is recommended that you install the Quooker in the following order:
A. Drilling hole
B. Fitting boiling-water tap
C. Connecting water
D. Connecting waste
E. Connecting tank
Note: Bear in mind that the tank, inlet combination, mixing valve and socket
must remain accessible for servicing.
For an overview of the Fusion tap installation, please refer to the next page.
Overview of Quooker COMBI E installation