Instruction book
2012 2039 28
86
Under the slave/compressor (no), there are four menus. First one is “Priority” . Under priority there are
two schemes. In each Priority scheme a Priority Level can be set per compressor. The lower the priority
level the higher the priority. Compressors with the same Priority Level will have the same Priority. By
default all priorities in both schemes are set to 1. Since two Priority schemes are available, a switch over
from one to the other Priority Scheme is possible (by Digital Input, Week Timer or via Display Menu).
Using scroll keys and selecting modify, the appropriate scheme is chosen.
Содержание QGV 40
Страница 2: ......
Страница 16: ...Instruction book 2012 2039 28 16 Main components Main components...
Страница 53: ...Instruction book 2012 2039 28 53 Text on figure Reference Designation 1 General 2 Language in use...
Страница 100: ...Instruction book 2012 2039 28 100 Electric cubicle layout fixed speed Electric cubicle layout Variable speed...
Страница 128: ...Instruction book 2012 2039 28 128 Appendix 1 Product Analysis Report...
Страница 131: ......