5.3
Starting
Procedure for
controller
as shown
Step
Action
-
At least 10 minutes before starting, the main supply to the dryer must be switched on to
initialize the
controller
and flow switch.
-
Close the dryer by-pass valve, if installed.
-
Press start button (14).
-
Open the dryer air inlet valve (customer's installation).
-
Approx. 5 minutes later, open the dryer air outlet valve (customer's installation).
-
Approx. 10 minutes later, the nominal dew-point will be reached.
5.4
During operation
Description for
controller
as shown
Instruction book
86
2920 1818 00
Содержание QED 650
Страница 5: ...9 Pressure equipment directives 96 Instruction book 4 2920 1818 00...
Страница 12: ...General view of QED 850 Instruction book 2920 1818 00 11...
Страница 13: ...General view of QED 1050 Reference Name 1 Air Logic Controller 2 Grating Instruction book 12 2920 1818 00...
Страница 14: ...Position of components Inside view of QED 650 Instruction book 2920 1818 00 13...
Страница 15: ...Inside view of QED 850 Instruction book 14 2920 1818 00...
Страница 26: ...Electrical diagram QED 650 Instruction book 2920 1818 00 25...
Страница 27: ...Electrical diagram QED 850 and QED 1050 Instruction book 26 2920 1818 00...
Страница 78: ...Dimension drawing of QED 850 Instruction book 2920 1818 00 77...
Страница 98: ......
Страница 99: ...Cod 2920 1818 00 Edition 09 2012 quincycompressor com info quincycompressor com 217 222 7700...