5
Operating instructions
5.1
Warnings
Safety precautions
The operator must apply all relevant safety precautions, including those mentioned in this manual.
Altitude operation
Consult your supplier if operating above 3000 m (9843 ft).
5.2
Initial start
Procedure for
controller
as shown
Step
Action
1
At least 10 minutes before starting, the main supply to the dryer must be switched on to
initialize the
controller
and flow switch.
2
Press start button (14).
•
Three-phase units are provided with a phase sequence relay. When the dryer
compressor motor does not start, switch off the voltage and reverse two incoming
electric lines.
Check the rotation direction of the fan motor(s). The correct rotation direction is indicated
by an arrow next to each fan. If incorrect, switch off the voltage and reverse two of the
three phase connections.
Instruction book
2920 1818 00
85
Содержание QED 650
Страница 5: ...9 Pressure equipment directives 96 Instruction book 4 2920 1818 00...
Страница 12: ...General view of QED 850 Instruction book 2920 1818 00 11...
Страница 13: ...General view of QED 1050 Reference Name 1 Air Logic Controller 2 Grating Instruction book 12 2920 1818 00...
Страница 14: ...Position of components Inside view of QED 650 Instruction book 2920 1818 00 13...
Страница 15: ...Inside view of QED 850 Instruction book 14 2920 1818 00...
Страница 26: ...Electrical diagram QED 650 Instruction book 2920 1818 00 25...
Страница 27: ...Electrical diagram QED 850 and QED 1050 Instruction book 26 2920 1818 00...
Страница 78: ...Dimension drawing of QED 850 Instruction book 2920 1818 00 77...
Страница 98: ......
Страница 99: ...Cod 2920 1818 00 Edition 09 2012 quincycompressor com info quincycompressor com 217 222 7700...