background image

QuietCool fan installation instructions

1

2

3

4

5

6a

6b

System Venting Requirements

VERY IMPORTANT! - 1

 

 SQUARE FOOT OF

 NET FREE

 VENTING PER 750 CFMs

REQUIRED

VENTILATION 

1 SQ. FT FOR EACH 750 CFMs

Vent type

Gable vent

Dormer vent

Eave vent

Ridge vent

Soffet vent

Average size

12" x 19.5" 

14" x 8"

3.5" x 22.5"

various

various

Venting Sq. Ft.

1.20

0.70

0.35

various

various

1.

Prepare a cardboard cut-out template to be used to mark the rough opening 

cutout in the ceiling.

The rough opening size varies depending on which model of QuietCool fan you 

are installing:

QC-1500 rough opening is 14-1/4” x 14-1/4”

QC-2250 rough opening is 14-1/4” x 18-1/4” 

QC-3100 rough opening is 14-1/4” x 22-1/4” 

QC-4500 rough opening is 14-1/4” x 36-1/4”

QC-4700 rough opening is 14-1/4” x 26-1/4”

QC-6400 rough opening is 14-1/4” x 36-1/4”

2.

Determine from down below in which areas you would like to install your

QuietCool fans.

3.

Go up into the attic to mark the exact location for each fan. Take the cardboard 
cut-out template and a small screwdriver with you. When you  nd a location,

move the insulation away to get a clear view. Make sure the template  ts

between the framing, and there are no obstructions in your chosen location.

When you have chosen your exact spot, place the template on the spot and
mark it at each corner by pushing the screwdriver through at each corner to

make a hole so that you can  nd it from below.

Repeat these steps at each location 

4.

From below, place the cut-out template on the ceiling at each location, making

sure that you have at least 2 inches of clearance all around it, because the grill
that will be installed later is 2 inches larger than the cut-out template. While

holding the template in place, mark its outline with a pencil. Using a drywall saw

or similar device, cut out the hole in the ceiling.

Repeat these steps at each location

 

5.

Open and unpack each QuietCool fan. Most of the system comes pre-
assembled. Take the main assembly with duct and the ceiling box up into the

attic through the crawl hole and move into position near the ceiling cut-out

hole.

6.

Hang the motor heads from the rafters by fastening the metal strapping that is
attached to motor heads to the rafters with the long wood screws. The goal is to

hang the motor head as far as possible from the ceiling cut-out hole while

making sure that the ceiling box and duct will easily reach the hole with a small

amount of slack. Also make sure that the power box on the motor head is at the

very top (12 O-clock). 

Secure duct to ceiling box using three black sharp screws.

Make sure the duct has a gentle 90 degree bend to help reduce noise level.

 _________________________________________________________

 _________________________________________________________

 _________________________________________________________

Отзывы: