![Quickie Quickie Revolution Скачать руководство пользователя страница 41](http://html2.mh-extra.com/html/quickie/quickie-revolution/quickie-revolution_owners-manual_3803529041.webp)
37
Revolution
Issue 5
Maintenance schedule
GENERAL
1. Tyre pressure
450 kilopascals/4.5 bar (65 psi) (rear wheels)
250 kilopascals/2.5 bar (36 psi) (Castors)
2. Wheel locks
Check for loose fasteners.
3. Castor (front) wheels
Check that the castor assembly and castor wheel
rotate freely.
4. Roll of wheelchair
Check that the wheelchair rolls in a straight line
with no excess drag or pull.
5. Folding the chair
Check that the wheelchair opens easily.
Check for loose fasteners.
6. Armrests (swing - away, height - adjustable)
Check for loose fasteners and that all
mechanisms work freely.
7. Joints and folding of chair
Check for loose and/or noisy joints.
8. Seat sling or back uphostery
Check for wear or ‘sagginess’ in the upholstery.
9. Complete inspection, safety check and service
should be made by an authorised Sunrise Medical
supplier or wheelchair agent.
10. Frame and axle plates
All Revolution wheelchairs leave the factory inspected and adjusted for
immediate use. Continuous use will require routine maintenance and
adjustments, especially if original settings are altered. Initial adjustment,
carried out by your wheelchair prescriber/supplier, should accommodate
your body structure and personal preference.
The chair needs to be checked after the first 4-6 weeks of use as the folding
mechanism will ‘run in’ and may need adjusting to avoid uneccessary
squeaking.
The following table gives an indication as to when routine maintenance checks
should be made which will help sustain the life and efficiency of your
wheelchair.
Revolution
CHECK LIST
Содержание Quickie Revolution
Страница 1: ...Owner s Manual REVOLUTION...
Страница 2: ...47 Revolution Issue 5...
Страница 45: ...41 Revolution Issue 5...
Страница 46: ......