background image

BT QSY 

Series

EN

QUICK 

BTQSYSeries

 INSTALLATION AND USER’S MANUAL - REV001B

10

4 - Installation

4.2 - Thruster

• The thruster can be installed at any angle within 90º from 
the vertical.
• If the electric motor is positioned at an angle of more than 
30° from the vertical, an appropriate support (saddle) must be 
installed.

SINGLE PROPELLER

DOUBLE PROPELLER

• 

To position the thruster in the tube, find the half-way point 

of the tube and move by the value indicated (left or right, see 
box) in the diagram below so that the propeller is positioned 
exactly in the middle of the inner length of the tunnel.

• 

To position the thruster in the tube, find the half-way point 

of the tube and move by the value indicated (left or right, see 
box) in the diagram below so that the propeller is positioned 
exactly in the middle of the inner length of the tunnel.

1

0

2

3

4

5

6

7

8

9

10

1

0

2

3

4

1

0

2

3

4

BT QSY 140       50 mm

1

0

2

3

4

5

6

7

8

9

10

• 

Use the flange to mark the centre of the holes on the tube.

• Fix the drilling template on the reference points, making 
sure they are aligned with precision at the half-way point of 
the tube.

N.B. All holes must be exactly aligned with the half-
way point of the tunnel, since tolerance between 
propeller and tunnel is minimal.

• Take care that there are no resin residues in the contact 

area between flange and tube; this could cause misalignment. 

Any resin residues and any other hindrance to correct 
contact must be removed with sandpaper.

BTQ SY Ø140/185/250/300

• 

Insert two O-rings into the special seats inside the flange.

Содержание BT QSY Series

Страница 1: ...SY 140 BT QSY 185 BT QSY 250 BT QSY 300 SINGLE AND DOUBLE PROPELLER SYNCHRONOUS MOTOR EN INSTALLATION AND USER S MANUAL Other languages available by scanning the QR code on the back of this manual or...

Страница 2: ......

Страница 3: ...recautions for the installer 7 3 3 Installation requirements 7 4 Installation 8 4 0 Propellers 8 4 1 Tunnel 9 4 2 Thruster 10 4 4 BT QSY 140 185 250 300 Gearleg and motor support flange 11 4 4 0 Singl...

Страница 4: ......

Страница 5: ...tor power 8 kW 12 kW 12 kW 16 kW Voltage 24 V 24 V 48 V 48 V Fuse 250 A CNL DIN 400 A CNL DIN 200 A CNL DIN 275 A CNL DIN Thrust 140 kgf 308 lb 200 kgf 440 9 lb 240 kgf 529 1 lb 300 kgf 660 lb Weight...

Страница 6: ...wrench 24 mm BT QSY300 Drill and drill bits 15 mm 19 32 Hollow mill 53 mm 2 3 32 Male hex wrenches 4 mm 5 mm 8 mm and 12 mm Fork wrench 27 mm 2 2 Compatible Quick remote control systems not included...

Страница 7: ...clothing and personal protective equipment PPE The product is not suitable for installation in potentially explosive environments and or atmospheres Installation and subsequent inspection or repair w...

Страница 8: ...IG 2 The lever effect in the boat is proportional to the increase of the distance L1 and L2 between the barycentre and the position of the tunnel A and B FIG 3 For greater lever effect prefer position...

Страница 9: ...ving produces resistance on the rear face of the tunnel which is an area exposed frontally to the water flow To limit this phenomenon prepare an indentation in the rear part of the tunnel The indentat...

Страница 10: ...move by the value indicated left or right see box in the diagram below so that the propeller is positioned exactly in the middle of the inner length of the tunnel 1 0 2 3 4 5 6 7 8 9 10 1 0 2 3 4 1 0...

Страница 11: ...the drive shaft fit the key into its seat 4 Insert the motor onto the elastic coupling secure it with the 4 screws and washers supplied 4 4 0 Single double propeller assembly Single propeller assembl...

Страница 12: ...on Electrical connection BT QSY 140 and BT QSY 185 Electrical connection BT QSY 250 and BT QSY 300 5 Wiring diagram NOT USED AMC QSY ADP FUSE SWITCH ELECTRICAL CONNECTION DETAIL BT QSY SYNCHRONOUS MOT...

Страница 13: ...system PCS connection 5 Wiring diagram THRUSTER BATTERY Connection to PCS Network system PCS MCI B PCS QSY ADP PCS QSY ADP PCS QSY ADP PCS QSY ADP PCS CHC EX QSY EX QSY EX QSY EX FUSE SWITCH Electrica...

Страница 14: ...tion SWITCH RED RED BLACK BLACK Common negative for battery groups Electrical connection BT QSY 140 and BT QSY 185 Electrical connection BT QSY 250 and BT QSY 300 BT QSY SYNCHRONOUS MOTORS NOT USED NO...

Страница 15: ...ure no swimmers or floating objects are in the vicinity before switching on the thruster There must not be flammable materials in the peak or in the area where the Thruster motor is Do not operate the...

Страница 16: ...the tightness of all screws Ensure that there is no water seepage inside Check that all electrical connections are well tightened and oxide less Check that the batteries are in good conditions 7 0 Pro...

Страница 17: ...ER BTQ140 FVSGANBTQ14AA00 5B OSP ANODES KIT FOR PROPELLERS BTQ185 FVSGANBTQ18AA00 6A OSP PROPELLER D185 RH QUICK 5 BLADES BLACK FVSGEL185R05A00 6B OSP PROPELLER D140 RH QUICK 5 BLADES BLACK FVSGEL140R...

Страница 18: ...X KIT BTQ250 FVSGGBBT2500A00 4B OSP GEARBOX KIT BTQ300 FVSGGBBT3000A00 5 OSP PROPELLER KIT D300 R NIBRAL FVSGEL300RN0A00 6 OSP PROPELLER KIT D300 L NIBRAL FVSGEL300LN0A00 7 OSP PROPELLER D250 RH QUICK...

Страница 19: ...85 100 A 350 13 3 4 350 13 3 4 B 185 7 5 16 185 7 5 16 C 268 10 9 16 268 10 9 16 SINGLE PROPELLER DOUBLE PROPELLER A B C A B C BT QSY250 BT QSY250 140 BT QSY250 200 A 343 13 1 2 373 14 11 16 B 250 9 1...

Страница 20: ...Piangipane 120 A 48124 Piangipane RAVENNA ITALY Tel 39 0544 415061 Fax 39 0544 415047 www quickitaly com quick quickitaly com REV 001B BT QSY Series BT QSY 140 BT QSY 185 BT QSY 250 BT QSY 300 Produc...

Отзывы: