![QUBINO ZMNHXD1 Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/qubino/zmnhxd1/zmnhxd1_user-manual_3601621022.webp)
EN
.
22
The installation process, tested and approved by professional electricians, consists of the
following simple steps:
Step 1
–
Turn OFF the fuse:
•
To prevent electrical shock and/or equipment damage, disconnect electrical power at
the main fuse or circuit breaker before installation and maintenance.
•
Be aware that even if the circuit breaker is off, some voltage may remain in the wires
—
before proceeding with the installation, be sure no voltage is present in the wiring.
•
Take extra precautions to avoid accidentally turning the device on during installation.