Installation
Intelligent Electric Vehicle Chargepoints
QUBEVSM-V01-R0 Installation and Operation Manual
Page
23
of
42
February 2023
Testing
WARNING: Electrical Power
Testing may require power to be applied whilst the front panel fascia is removed. If this is not
required, replace the front fascia NOW and secure it with the bolts removed at the start of the
installation. Take care not to trap any electrical cables.
1. Make sure all accessible terminals/wires are secure and have not become loose or
detached during the installation.
2. Make sure there is no installation debris inside the enclosure.
3. Test the charger in accordance with the current Electrical Wiring Regulations.
x
If required, refer to the Application Setup section for functional testing.
x
Make sure this product has been installed in compliance with the current Electrical
Wiring Regulations (including recommended earthing arrangements).
4. Make sure you are satisfied that the installation is complete and is in a safe condition.
5. Fit the front fascia to the charger and secure it with the bolts removed at the start of the
installation. Take care not to trap any electrical cables.
6. Fit and secure the charger to the mounting bracket.
7. A functional test of the charger can be performed during Application Setup.