Quantum ATL 4000 Library Unpacking Instructions

Document 6434005-02, Ver. 2, Rel. 0

August 2002

Selecting an Installation Location

5

Floor Clearance

0

The library has a floor clearance of 0.75 inch (19 mm). Place the library 

on a level, uncarpeted floor free of defects.

Floor Strength and 
Inclination

0

The floor at the installation site must be rated at 250 lb/ft

2

 

(1221 kg/m

2

). This is sufficient to support a fully loaded ATL P4000 

library. 
The floor must be level to within 0.25 inch (6.4 mm) over a 6-foot-by-6-

foot (1.83-meter-by-1.83-meter) area.

Power and Grounding

0

For the United States and Canada, one or two UL/CSA certified power 

cords are furnished. Each uses a 14/3 SJT cord, a 5-20P plug, and an 

IEC-C320 C19 female connector (see 

figure 3

).

Figure 3  Power Supply 
Cord

The library is rated 100-240V~, 50-60Hz, 12A-8A, 1200W. 
The library power requirements may require modification of the 

facilities existing power capabilities by a qualified electrician. The 

required wall outlet for the United States and Canada is rated at 125V 

20A (see 

figure 4

).

Figure 4  Wall Outlet

The dedicated wall outlet and a 20 amp circuit breaker must provide 

power to the ATL P4000 library only. Outside North America, replace 

the supplied power cord with a harmonized 3 x 1.5 mm

2

 power cord 

that is approved by the country where used, and install the 

appropriate wall outlet. More information on the electrical 

requirements is provided in the 

ATL P4000 Pre-Installation Site Survey 

Instructions. 

Caution:

The ATL P4000 library must be connected to a grounded 

electrical outlet.

Plug:
NEMA 5-20

Connector:
IEC-C320 C19

Connects to library
power supply

Connects to
wall outlet

Neutral

Ground

Line

Wall outlet
NEMA 5-20R
rated 125V 20A

Содержание P4000 Series

Страница 1: ...e 5 Floor Strength and Inclination 5 Power and Grounding 5 Environmental Conditions 6 Preparing for the Installation 6 Providing Necessary Tools and Equipment 6 Taking ESD Precautions 6 Unpacking the...

Страница 2: ...Quantum ATL 4000 Library Unpacking Instructions Document 6434005 02 Ver 2 Rel 0 August 2002 2 6207947 04fN 13...

Страница 3: ...torage and retrieval library consisting of up to 10 tape drives and up to 322 tape cartridges see figure 1 This document explains how to unpack the ATL P4000 Once the library is unpacked and moved to...

Страница 4: ...lowing requirements Floor space Floor clearance Floor strength and inclination Power and grounding Environmental conditions These requirements are also described in the ATL P4000 and ATL P7000 User s...

Страница 5: ...Power Supply Cord The library is rated 100 240V 50 60Hz 12A 8A 1200W The library power requirements may require modification of the facilities existing power capabilities by a qualified electrician Th...

Страница 6: ...ent for installation Taking ESD precautions Providing Necessary Tools and Equipment 0 Provide the following tools for unpacking the library Scissors Ratchet with 15 16 inch socket or 15 16 inch open e...

Страница 7: ...metal surface Place them inside their protective shipping bag or on an antistatic mat Avoid touching connectors and other components Unpacking the Library 0 This section explains how to unpack the lib...

Страница 8: ...aded from either the right or left side of the pallet 2 Verify the minimum floor space requirements Caution The ATL P4000 weighs approximately 1072 pounds 486 kg without drives Each drive weighs appro...

Страница 9: ...Minimum Floor Space Requirements Uncrating Site 3 Cut the two steel bands that secure the library and packing material to the pallet see figure 6 Caution The steel bands are under tension and will sn...

Страница 10: ...Instructions Document 6434005 02 Ver 2 Rel 0 August 2002 10 Unpacking the Library Figure 6 Removing the Steel Bands 4 Lift the cardboard box top cover straight up and off of the pallet see figure 7 F...

Страница 11: ...n position 6 Unwrap the cardboard box from the library see figure 8 Figure 8 Removing the Cardboard Box 7 Remove the accessory kit from the rear compartment of the crate 8 Check the packing list and v...

Страница 12: ...ions Document 6434005 02 Ver 2 Rel 0 August 2002 12 Unpacking the Library Figure 9 Removing the Foam Cap 10 On the right side of the library lift the wooden bar out of its brackets on the pallet see f...

Страница 13: ...ts 12 Remove each hold down bracket from under the library see figure 11 using the supplied wrench Figure 11 Removing the Stop Blocks 13 Re insert the left side wooden bar in its brackets on the palle...

Страница 14: ...tensions 16 Place the ramp extensions aside until the library is ready to be positioned 17 Re insert the right side wooden bar into its brackets on the pallet to hold the library in place Positioning...

Страница 15: ...Inspect the library for any damage that may have occurred during shipment 4 Place the two ramp extensions in the slots provided at the edge of the pallet see figure 14 Note The ramp may be set up on...

Страница 16: ...0 August 2002 16 Unpacking the Library Figure 14 Preparing the Ramp 5 Verify that the library s four leveling feet are raised If not raise each foot as needed as by turning the leveling foot until it...

Страница 17: ...ide of the pallet b Turn the bar over and place it under the ramp extensions for support see figure 16 Figure 16 Moving the Wooden Bar 7 With the help of one or more people carefully guide the library...

Страница 18: ...brary to a grounded power source 2 Unlock and open the library door a Using the key from the accessories kit unlock the door b Lift the door handle straight up and then turn the handle to unlatch the...

Страница 19: ...e bolts and washers securing the plate to the load port see figure 18 b Remove the shipping plate from the load port Figure 18 Removing the Load Port Shipping Plate 5 Locate the vertical carriage asse...

Страница 20: ...screw that secures the horizontal carriage restraint to the floor of the library c Remove the horizontal carriage restraint Figure 20 Removing the Horizontal Carriage Restraint 7 Slide the horizontal...

Страница 21: ...vertical axis until the gripper assembly is fully extended and the gripper restraint disengages from the follower guide see figure 22 Figure 22 Releasing the Gripper Restraint c Pivot the gripper rest...

Страница 22: ...screw that secures the vertical carriage restraint to the vertical carriage c Gently lift the vertical carriage to eye level d Squeeze the two sides of the vertical belt together making sure to inter...

Страница 23: ...s 0 To store the shipping and packaging materials for future use 1 Use the screws removed in steps 6 8 and 9 to secure the shipping restraints to the inside of the library see figure 25 Note The profi...

Страница 24: ...nd other packaging materials on the pallet 7 Collapse the cardboard box 8 Place the cardboard box on top of the packaging materials on the pallet 9 Secure the pallet packaging materials and cardboard...

Страница 25: ...w b Adjust the leveling foot on the low side of the library by rotating the leveling foot with the open end wrench 5 Repeat step 4 until the front is level 6 Repeat steps 3 and 4 for the left edge bac...

Страница 26: ...Quantum ATL 4000 Library Unpacking Instructions Document 6434005 02 Ver 2 Rel 0 August 2002 26 Unpacking the Library...

Отзывы: