![Quantum GoVault 40GB Скачать руководство пользователя страница 52](http://html1.mh-extra.com/html/quantum/govault-40gb/govault-40gb_software-manual_3539228052.webp)
Chapter 3 Operation
Creating a Protection Plan
GoVault™ Data Protection Software, Version 1.0 User’s Guide
38
• If the computer has not been idle that long, retry for up to 1-
999 minutes
• Stop the task if the computer ceases to be idle
• Power Management options:
• Don’t start the task if the computer is running on batteries
• Stop the task if battery mode begins
• Wake the computer to run the task
10
Click
OK
to save your advanced scheduling tasks and close the
Scheduled Task
dialog.
Figure 28 Scheduled Task
Settings Tab