Chapter 3 Installing the Library
Gathering Required Tools
22
ACL 4/52 Facilities Planning and Installation Guide
Gathering Required Tools
3
Make sure you have the tools listed in table 1 before beginning this
installation.
Table 1 Required Tools
Quantity
Description
1
#2 Phillips screwdriver
1
Wire cutters
1
Carpenter ’s level
1
1
3
/
8
-inch open-ended wrench
1
Digital voltmeter (DVM)
1
Antistatic wristband
Содержание ACL 4/52
Страница 6: ......
Страница 10: ...x ACL 4 52 Facilities Planning and Installation Guide...
Страница 12: ...xii ACL 4 52 Facilities Planning and Installation Guide...
Страница 66: ...Glossary 50 ACL 4 52 Facilities Planning and Installation Guide...