5

 Table 1-5 FPC Expansion Board Discrete Input Configuration

Input

Default

Configured to:

Initials

1

2

3

4

5

6

 Table 1-6 FPC Expansion Board Relay Output Configuration

Input

Default

Configured to:

Initials

1

2

3

4

5

6

7

8

Содержание PowerGen 5650 Series

Страница 1: ...7045 102124 000 June 1 2021 Installation Commissioning Checklist FOR A QUALIFIED INSTALLER...

Страница 2: ...this publication may be reproduced or transmitted in any form or by any means electronic or mechanical including photocopying recording scanning or using any information storage and retrieval system...

Страница 3: ...10 PSI LPG Biogas consult with Qnergy Engineering Dept 5 Earth Ground Connection to front of PowerGen enclosure Customer Signature Date DD MM YYYY Table 1 2 Safety Checks and Basic Information Safety...

Страница 4: ...l Information General Information Customer Name Customer Engineer Name s Appliance Site Country City and Place Site Name GPS Location Commissioning Date PowerGen Serial Number OptConnect Modem SN Powe...

Страница 5: ...tion and Operation manual for reference or the label on the engine beam of the system near the helium fill port Engine Temperature indicated by FPC C Engine Helium pressure after filling PSI BAR 4 Gas...

Страница 6: ...ter verifying customer loads Measure voltage and current output from PowerGen Verify load does not exceed generated power 11 Side panels installed and front access door closed 12 Verify no active warn...

Страница 7: ...LISTS 5 Table 1 5 FPC Expansion Board Discrete Input Configuration Input Default Configured to Initials 1 2 3 4 5 6 Table 1 6 FPC Expansion Board Relay Output Configuration Input Default Configured to...

Страница 8: ...eck the internal coolant loop for signs of leaks Hoses fittings joints 4 Inspect the burner seal flexible for evidence of degradation such as cracking discoloration or powder on its external surfaces...

Страница 9: ...ns at the exhaust outlet port Tune if necessary per the gas valve tuning procedure 13 Lambda calibrated values Lambda High Lambda Low 14 Record activity performed in the SmartView Action log file 15 M...