12
– 12|2017 – Subject to change.
Speedkid2 2018
Assembly
Below you can read all the information that you will need to assemble your
Speedkid2
properly.
f
Make sure that you have sufficient space to assemble it.
Also pay attention to the door width at the place of installation: The
Speedkid2
is 87 cm wide
with the wheel guards fitted.
f
Have a size 4 hex key to hand (not supplied).
f
Perform each of the instructions step by step.
f
If necessary, follow the QR code to call up a video about
assembly and operation on the Internet.
VIDEO TU
TO
RIA
L
Danger!
Never perform assembly work if there are children in the cabin. Keep children away from
the vehicle during assembly.
When handling moving components, make sure that your hands or fingers do not get
trapped.
Before using the appliance for the first time, check all screwed and splint connections
carefully.
Unfolding the cabin
f
Place the collapsed cabin in the assembly area.
f
Stand in front of the cabin and hold it securely by the
front tube of the main frame.
f
With your other hand, grip the tube of the rear roof
support and fold it all the way to the back.
f
Hold each of the side tubes of the folding system by
the lower part of the hinge.
f
Press both hinges down until they engage audibly.
f
Open the 2-in-1 cover to mount the stabilizer bars.
The stabiliser rods secure the folded-open cabin by connecting the rear roof support to the front
one inside the cabin (see the illustration in chapter
„Spare parts“ on page 33
). The pre-fitted tube
clamps of the stabiliser rods are placed with gentle pressure onto the tubes of the roof supports in
order to achieve this. The tube clamps are preset so that the connection can be made slightly above
the rear side windows: