
13
Line up the Lower Baseboard Spacer with the lower hole
and using one of the Long 3.25” (85 mm) Screws and
attach it loosely.
Attach the peg in spacer L to the back of the Top Hinge.
Using one of the Long 3.25” (85 mm) Screws attach it
loosely to the wall.
Move the level to the front of the rail. Insert the thick
spacer (O) inside the Top Cover (P) and slide down
behind spacer L until they rest on the screw. Now push
the rail against the wall and check if it is vertical. If not
vertical, remove Top Cover and use any combination of
the spacers (M,N,O) until the rail is vertical.
Finally tighten both screws firmly.
Then continue with instructions from Step 6.