12
GATE OPERATION
To open the gate slide back the locking latch on the
handle and at the same time lift the gate and open the
door.
To close and lock the gate, lift the gate handle and line
up the Top and Bottom Locks, then simply push down
and the At-A-Glance Indicator™ will switch to green
indicating that it is locked.
USING INCLUDED BASEBOARD SPACERS
If there is a baseboard present where you want to install
the gate, measure the height of the baseboard from the
floor.
• If the height is 4.25” (10.8 cm) or less you can use the
included Baseboard Spacers for a vertical installation
of the Hinge and Locking FastMount™ Rails.
• If the height is more than 4.25” (10.8 cm) tall, you
will need the Qdos Baseboard Kit in order to create a
vertical mounting surface. The kit can accommodate
baseboards up to 7” (18 cm) tall.
Use a stud-finder to find the location of a stud to screw
into. Follow Step 3 and 4 to mark the hole locations on
the wall.