![Qcells Q.PEAK DUO XL-G11S.X / BFG Series Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/qcells/q-peak-duo-xl-g11s-x-bfg-series/q-peak-duo-xl-g11s-x-bfg-series_installation-and-operation-manual_3129120009.webp)
INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11S.X / BFG
9
4 CLAMPS ON LONG SIDE &
2 CONTINUOUS RAILS UNDERNEATH LONG FRAME PARTS
2 CLAMPS ON LONG SIDE, 2 CLAMPS ON SHORT SIDE
CL3
L
CL5
L
S
POSITION OF
CLAMPS* [in]
TEST LOAD
PUSH / PULL [Pa]
DESIGN LOAD
PUSH / PULL [Pa]
POSITION OF
CLAMPS* [in]
TEST LOAD
PUSH / PULL [Pa]
DESIGN LOAD
PUSH / PULL [Pa]
L
15.8 - 21.7
(400 - 550 mm)
3600 / 2400
2400 / 1600
S
0.79 (20 mm)
2400 / 2400
1600 / 1600
L
27.6 (700 mm)
CL3
Ensure that module frame is fixed directly on the rail of the substructure (no spacer allowed between the
module and substructure).
Minimum support depth of 0.59 in (15 mm) is required on the back side of the module.
CL5
Minimum required support depth on the module backside is 0.39 in (10 mm) on long frame side and 0.59 in
(15 mm) on short frame side.
*
Distance between outer edge of module and middle of the clamp.