![Qcells Q.PEAK DUO XL-G11S.X / BFG Series Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/qcells/q-peak-duo-xl-g11s-x-bfg-series/q-peak-duo-xl-g11s-x-bfg-series_installation-and-operation-manual_3129120013.webp)
INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11S.X / BFG
13
Fig. 2:
Definition of limited areas.
NOTE!
For a requested push load maintain a minimum distance (clear-
ance) between the bottom module plane (level of bottom frame
leg) and closest substructure element below solar module lam-
inate. The minimum clearance is defined by the maximum test
push load and the limited area where the substructure element is
located beneath the module (see figure 2 and 3).
Fig. 3:
Push loads in relation to minimum clearance between
frame bottom edge and substructure.
2 Planning
2.3 Mounting options
Specifications for TB1a, TB1b, TB2a, TB2b and TC1 Mounting Options
100
257
257
100
100
120
160
160
Limited area 1 [mm]
Limited area 2 [mm]
CLEARANCE [mm]
TES
T L
O
AD
[P
a]
Limited Area 1
Limited Area 2
5
10
15
20
25
30
35
40
45
200
600
400
800
1000
1200
1400
1600
1800
2000
2200
2400
2600
2800
50
55
60
65
Limited Area 1
Limited Area 2
TB1b, TB2b
TB1a, TB2a, TC1