QASAIR Installation Instructions
44
225.
HB-250/45 Horizontal Bend 45º
226.
TMT-250/90 Duct Deflector 250sq
Left or Right
227.
BD/WV-250SQ Back Draft Wall 250sq
‹‹
twin
m
otor
228.
BD/WV-250SQ MGS Back Draft Wall
250sq Marine Grade Stainless Steel
231.
CH-300 Chairman's Hat 300º
234.
BD/RC-250SQ Back Draft Roof Cowl 250sq
229.
BD/RC-2 Back Draft Roof Cowl
232.
CH-300 CB Chairman's Hat 300º Colourbond
235.
DLE-2-S/S CAP Flue Cap
230.
BD/RC-2 CB Back Draft Roof Cowl
Colourbond
233.
BD/SQ-RC-300 Back Draft Roof Cowl 300ø
236.
CF-10/12/1500H Ceiling Flange
10/12/1500H
Содержание 1200HL-2
Страница 1: ...Ventilation systems Installation Instructions...
Страница 13: ...QASAIR Installation Instructions 11 Executive Range UNDERMOUNTED NDCH 100F 2 Top Back ducted...
Страница 30: ...QASAIR Installation Instructions 28 Island hood fixing for flat cathedral and exposed beam roofs...
Страница 52: ...QASAIR Installation Instructions 50 1 FA 60 1B 2 FA 90 1T INSTALLATION ideas 3 FA 60 1T...
Страница 53: ...QASAIR Installation Instructions 51 5 FA 60 1T 4 FA 60 1T 6 FA 60 1T 60 1B 7 FA 90 2T 8 FA 90 2T 9 FA 90 2T...