16
17
INSTALLATION AND OPERATION MANUAL SOLAR MODULES GENERATION 4 (G4.1) – HANWHA Q CELLS AUSTRALIA PTY LTD – EN
INSTALLATION AND OPERATION MANUAL SOLAR MODULES GENERATION 4 (G4.1) – HANWHA Q CELLS AUSTRALIA PTY LTD – EN
17
16
Ä
Use solar cables for the connection at
the junction box outlet.
Ä
Use the same, inverter-compatible plugs.
SOLAR
NOTE
! Module damage may occur!
Ä
Ensure that the cabling is not under
stress.
Ä
Ensure that the cables do not run
between module and subconstruction
(danger of pinch).
Ä
Do not connect modules with different
orientations or angles of inclination in
the same string.
Ä
Ensure for a tight connection between
the plugs. Plugs click together audibly.
click
EN
DANGER
! Risk of fatal injury due to electric
shock!
Ä
Ensure that all electrical components are
in a proper, dry, and safe condition.
Ä
Standard wiring with a return cable.
Inverter
EN
4.3 Connection of modules
4
ELECTRICAL CONNECTION
Ä
Ensure that all necessary safety and
functional tests have been carried out
according to current industry standards.
NOTE
! Module damage may occur!
Ä
Ensure that the plug connections are
secured away from any water-channelling
surface.
Ä
Integrate the system into the existing
lightening protection system in
accordance with the applicable local
regulations.
WARNING
! Fire Risk!
Ä
Do not use light concentrators (e.g.
mirrors or lenses).
Ä
Ensure that the cabling is not exposed
and/or hanging and is protected from dirt
and moisture.
Ä
Ensure that cables are protected from
abrasion, tension, compression and
cutting forces in full accordance with
AS / NZS 3000 and all other relevant
standards.
4.4 After installation
4
ELECTRICAL CONNECTION