4
5
INSTALLATION AND OPERATION MANUAL SOLAR MODULES DUO-G5.X – HANWHA Q CELLS – EN
INSTALLATION AND OPERATION MANUAL SOLAR MODULES DUO-G5.X – HANWHA Q CELLS – EN
For additional information see the relevant datasheet of the module provided at www.q-cells.com.
PRODUCT LINE
Q.PEAK DUO-G5.X
Q.PEAK DUO BLK-G5.X
Type
Q.ANTUM
Area [m²]
1.69
Frame height [mm]
32
Weight [kg]
18.7
Max. system voltage V
SYS
[V]
1000
Max. reverse current [A]
20
Permissible temperature range
–40 °C to +85 °C (–40 °F bis +185 °F)
Junction box protection class
IP67 with bypass diode
Connector protection class
IP68 and IP65
Fire protection class
C
Push load [Pa]
1
5400
Pull load [Pa]
1
4000
Certificates
VDE Quality Tested; CE-compliant; IEC 61215 (Ed.2) see page 9 et sqq.;
IEC 61730 (Ed.1) Application Class A
1
‘Test Load’ in accordance with IEC 61215 and ‘Design Load
×
1.5’ in accordance with UL 1703
Validity
These instructions are only valid for crystalline solar
modules from the company Q CELLS as specified
at chapter „2.1 Technical specifications“. Q CELLS
assumes no liability for damage resulting from failure to
observe these instructions.
Ä
Please observe the wiring and dimensioning of the
system.
Ä
The installer of the system is responsible for compliance
with all necessary safety regulations during set-up and
installation.
Q CELLS assumes no liability on the basis of these
instructions. Q CELLS is only liable in the context of
contractual agreements or in the context of accepted
guarantees. Q CELLS accepts no other responsibility for
the functionality and safety of the modules.
Ä
Please observe the instructions for any other sys-
tem components that may be part of the complete
solar power system. It may be necessary to carry out a
structural analysis for the entire project.
Additional information for the Operator
Ä
Please keep this manual for the entire life of the solar
power system.
Ä
Please contact your system supplier for information
concerning the formal requirements for solar power
systems.
Ä
Please be sure to contact the relevant local authorities
and energy providers regarding regulations and permit
requirements prior to installation of the solar power
system. Your financial success depends on the fulfillment
of these requirements.
Other applicable documents
In addition to this Manual following technical information
are relevant:
DOCUMENT TYPE
Product data sheet
Packaging and transport information
1 INTRODUCTION
2.1 Technical specifications
2 PLANNING
Fig. 1:
External dimensions (in mm) and components for
Q.PEAK DUO-G5.X, Q.PEAK DUO BLK-G5.X,
DETAIL A
16mm
8.5mm
24.5mm
980mm
1685mm
4 × Mounting slots (DETAIL A)
Frame
1000mm
951mm
32mm
8 × Drainage holes
352.5mm
EN
6 × Grounding points ø 4.5mm
≥
1100
mm
≥
1100
mm