INSTALLATION AND OPERATION MANUAL SOLAR MODULES DUO-G5.X – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES DUO-G5.X – Q CELLS

21

Q CELLS solar modules are known for a long operating life and 
minimal maintenance effort and expense. Dirt and grime are usually 
washed away by rain. If the module is fully or partially shaded by 
dirt or debris (e.g., plants, bird droppings), it needs to be cleaned 
to prevent a loss of performance.

Maintenance

 

Ä

The PV system has to be inspected regularly by certified 
personnel.

 

Ä

The time intervals and extent of the inspection can depend 
on local circumstances (e.g. salt, ammonia content in the air, 
high humidity etc.). The customer/operator must inform himself 
about time intervals and extend of necessary inspections. 

 

Ä

Inspections have to be performed especially after extraordinary 
events (e.g. storm, hail, high snow loads etc.)

 

Ä

During the inspections it has to be checked that the components 
are secure, undamaged and clean.

Cleaning

WARNING!  
Risk of injury due to hot and live modules!

 

Ä

Only clean modules that have cooled down.

 

Ä

Do not carry or wear any electrically conductive parts.

WARNING!  
Risk of falling due to unsecured access! 

 

Ä

Never access the installation area alone or without taking ade-
quate security precautions.

 

Ä

Please commission a trade specialist.

NOTE!  
Module surface damage may occur! 

 

Ä

Remove snow and ice carefully without force (e.g. with a very 
soft broom).

 

Ä

Do not scratch off dirt.

 

Ä

Rinse dirt (dust, leaves, etc.) off with lukewarm water or use an 
alcohol based glass cleaner. Do not use abrasive detergents 
or surfactants. 

 

Ä

Use a soft cellulose cloth (kitchen roll) or sponge to carefully wipe 
off stubborn dirt. Do not use micro fleece wool or cotton cloths.

Isopropyl alcohol (IPA) can be used selectively to remove stubborn 
dirt and stains within one hour after emergence.

 

Ä

Please follow the safety guidelines provided by the IPA man-
ufacturer. 

 

Ä

Do not let IPA run down between the module and the frame or 
into the module edges.

NOTE! Module damage may occur!

 

Ä

Do not clean modules with water if there is a risk of 
frost.

6  MAINTENANCE AND CLEANING

 

Ä

Free the substructure from any dirt and debris 
(leaves, bird nests, etc.).

 

Ä

Remove dirt with lukewarm water or alcohol based 
glass cleaner, a broom, or a soft cloth.

 

Ä

Do not use surfactants, rotating brushes, scrapers, 
or any high-pressure water cleaning equipment.

DANGER!  
Risk of fatal injury due to electric shock!

 

Ä

Do not attempt to fix any problems yourself (e.g. glass cracks, 
damaged cables).

 

Ä

Please contact an installer or Q CELLS Technical Customer 
Service Department.

 

Ä

Do not disconnect modules yourself.

 

Ä

Please commission a trade specialist.

 

Ä

Dispose of modules in accordance with the local disposal 
regulations.

6  FAULTS AND DEFECTS

7  DISPOSAL

5  GROUNDING

Option B: Integrated grounding methods

The Q CELLS modules can be bonded with the racking system 
using UL1703 or UL2703 certified integrated grounding methods. 
The racking system will then have to be grounded so that the overall 
system is properly grounded. The listed racking system and grounding 
device should be installed in accordance with the manufacturers’ 
instructions. An example of such integrated grounding method is 
the use of a WEEB clip or Schletter plate between the module and 
the racking system, when mounting the module. 

The WEEB washers are generally compatible with Q CELLS modules, 
however each combination module / racking system requires a specific 
WEEB washer size. Note that WEEB clips are intended for single use 
only; they must not be reused after removal or loosening. Refer to 
Wiley’s installation instructions for the specific use of WEEB washers.

An example of such integrated grounding method is the use of a 
washer recognized as meeting UL2703 requirements between the 
module and the racking system, when mounting the module. For 
example, WEEB washers are generally compatible with Q CELLS 
modules, however each combination module / racking system 
requires a specific WEEB washer size. Note that WEEB washers are 
intended for single use only; they must not be reused after removal 
or loosening. Refer to Wiley’s installation instructions for the specific 
use of WEEB washers.

PV Laminate

Backing Nut (Stainless Steel)

Toothed Lock Washer (Stainless 
Steel)

Grounding Lug (Stainless Steel 
or tin-plated metal)

Equipment 
Grounding 
Conductor

Aluminum 
Frame

Screw (Stainless Steel)

Содержание Q.PEAK DUO-G5 series

Страница 1: ...Valid for North America INSTALLATION AND OPERATION MANUAL DUO G5 X solar module series...

Страница 2: ...llowing regulations and standards must be upheld at all times during the installation operation and maintenance of the solar modules Installation and Operation Manual Other applicable documents such a...

Страница 3: ...ORIZED MODIFICATION Fig 1 External dimensions in inch mm and components for Q PEAK DUO G5 Q PEAK DUO BLK G5 Q PLUS DUO G5 Q PLUS DUO BFR G5 Q PEAK DUO G5 2 Q PEAK DUO BLK G5 2 Q PLUS DUO G5 2 Q PLUS D...

Страница 4: ...ns Operating temperatures from 40 F to 185 F Pull loads and push loads according to chapter 2 3 Test Load in accordance with IEC 61215 and Design Load 1 5 in accor dance with UL 1703 Installation usin...

Страница 5: ...3 88 352 5 IP1 CL1 0 9 84 0 250 17 72 21 65 450 550 2400 2400 1600 1600 CL2a with rails CL2b without rails 0 11 81 0 300 CL4 0 11 81 0 300 CL5 short side 0 9 84 0 250 long side 11 81 17 72 300 450 400...

Страница 6: ...g the maximum number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ensure that...

Страница 7: ...e damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT DANGER Risk of fatal inju...

Страница 8: ...result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire open c...

Страница 9: ...ersonnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Use the same inverter compatible plugs Use minimum No 12 AWG copper wires insulated for a min...

Страница 10: ...l shock or fire the frame of the module as well as any non current carrying metal parts of the system must be grounded While this section provides some information about grounding the Q CELLS frames a...

Страница 11: ...rost 0 6 MAINTENANCE AND CLEANING Free the substructure from any dirt and debris leaves bird nests etc Remove dirt with lukewarm water or alcohol based glass cleaner a broom or a soft cloth Do not use...

Страница 12: ...400 Spectrum Center Drive Suite 1400 Irvine CA 92618 USA TEL 1 949 748 59 69 EMAIL inquiry us q cells com WEB www q cells us Subject to change without notice Q CELLS Installation manual solar modules...

Отзывы: