background image

8

9

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO BLK-G6+ / AC – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO BLK-G6+ / AC – Q CELLS

2  PLANNING

2.2  THE ENPHASE IQ SYSTEM

The Enphase IQ System includes: 

The smart grid ready microinverter converts the DC output of the 
PV module into grid-compliant AC power.

• 

Enphase IQ Envoy™

 (model ENV-IQ-AM1-240) communications 

gateway or IQ Combiner (model X-IQ-AM1-240-2 or 240-3): 
The Enphase IQ Envoy is a communication device that provides 
network access to the PV array. The IQ Envoy collects produc-
tion and performance data from the Enphase IQ Microinverters 
over on-site AC power lines and transmits the data to Enlighten 
through an internet or cellular modem connection. The IQ Envoy 
is capable of monitoring up to 600 Enphase IQ Microinverters 
and up to 39 Enphase IQ Batteries. For details, refer to Enphase's 
IQ Envoy Installation and Operations Manual.

• 

Enphase Enlighten™

 web-based monitoring and management 

software. Installers can use Enlighten Manager to view detailed 
performance data, manage multiple PV systems, and remotely 
resolve issues that might impact system performance. Find out 
more at enphase.com/enlighten.

• 

Enphase Installer Toolkit™

 mobile app for iOS and Android 

devices. It allows installers to configure the system while onsite, 
eliminating the need for a laptop and improving installation 
efficiency. You can use the app to:

• 

Connect to the IQ Envoy over a wireless network for faster 
system setup and verification

• 

View and email a summary report that confirms a successful 
installation

• 

Scan device serial numbers and sync system information with 
Enlighten monitoring software

• 

Enphase Field Wireable Connectors (Q-CONN-10F and Q-CONN-
10M)  

Use Enphase Field Wireable Connectors with Enphase Q Cable 
or field cable to:

• 

Easily connect Q Cable on the roof without complex wiring

• 

Use female connectors to make connections from any Q 
Cable open connector

• 

Make a jumper to connect with a remote part of the array: Use 
female to female for cable-to-cable connections

• 

Use a mated pair of connectors to splice two cut ends of cable

How the AC Module Works

The Enphase Microinverter maximizes energy production by using 
a sophisticated Maximum Power Point Tracking (MPPT) algorithm. 
Each Enphase Microinverter is individually connected to one PV 
module on the array. This configuration enables an individual MPPT 
to control each PV module, ensuring that maximum power available 
from each PV module is exported to the utility grid regardless of 
the performance of the other PV modules in the array. 

While an individual PV module in the array may be affected by 
shading, soiling, orientation, or PV module mismatch, each Enphase 
Microinverter ensures top performance for its associated PV module.

System Monitoring

Once you install the Enphase IQ Envoy or Enphase IQ Combiner 
and provide an internet connection through a broadband router 
or modem, the Enphase IQ Microinverters automatically begin 
reporting to Enlighten. Enlighten presents current and historical 
system performance trends and informs you of PV system status.

Optimal Reliability 

Microinverter systems are inherently more reliable than traditional 
inverters. The distributed nature of a microinverter system ensures 
that there is no single point of system failure in the PV system. 
Enphase Microinverters are designed to operate at full power at 
ambient temperatures as high as 150°F (65°C).

Ease of Design

PV systems using Enphase Microinverters are very simple to design 
and install. You will not need string calculations or cumbersome 
traditional inverters. Low voltage DC wires connect from the PV 
module directly to the co-located microinverter, eliminating the risk 
of personnel exposure to dangerously high DC voltage.

For additional information, see the relevant datasheet of the module provided at www.q-cells.us.

SPECIFICATION

VALUE

Voltage Rating

600 V

Voltage Withstand Test (kV/1 min)

AC 3.0

Max DC Conductor Resistance 

(68°F / 20°C) (

Ω

/km)

5.433

Insulation Resistance (68°F / 20°C)

≥20M (

Ω

/km)

System Temperature Range (ambient)

−40°F to 149°F (−40°C to +65°C)

Cable temperature rating

194°F (90°C) Dry / 194°F (90°C) Wet

Cable rating

DG

Certification

UL 3003, TC-ER equivalent 

Flame test rating

FT4

Cable conductor insulator rating

THHN/THWN-2

Environmental protection rating

IEC 60529 IP67 NEMA 6

UV resistance

720 h

Compliance

RoHS, OIL RES I, CE, UV Resistant, combined UL for Canada and United States

Conductor size

12 AWG

Maximum loop size

4.75 in (12 cm)

Drop connector dimensions

4.64 in x 2.36 in x 1.25 in (11.8 cm x 6.0 cm x 3.2 cm)

Terminator cap dimensions

1.4 in diameter x 2 in tall (3.6 cm x 5.1 cm)

Enphase Q Cable

2  PLANNING

2.1  TECHNICAL SPECIFICATIONS

Enphase Connector Ratings

Enphase connectors in the following table have a maximum current 
of 20 A, a maximum OCPD of 20 A, and an ambient temperature 
range of −40°F to +174.2°F (−40°C to +79°C).

PART NUMBER

MODEL

MAXIMUM VOLTAGE

840-00387

Q-12-10-240

277 VAC

840-00388

Q-12-17-240

277 VAC

840-00389

Q-12-20-200

277 VAC

NOTE! 

 
Only Enphase connectors/ solar cables are permitted.

Содержание Q.PEAK DUO BLK-G6+/AC

Страница 1: ...Valid for North America INSTALLATION AND OPERATION MANUAL Q PEAK DUO BLK G6 AC Solar Module Series ...

Страница 2: ... The following regulations and standards must be upheld at all times during the installation operation and maintenance of the solar modules Installation and Operation Manual Other applicable documents such as country specific regu lations for pressure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Applicable country spe...

Страница 3: ...tallation manual is only valid in combination with the following technical information DOCUMENT TYPE Product data sheet Packaging and transport information MISUSE OR INCORRECT USE OF SOLAR MODULES VOIDS THE LIMITED WARRANTY AND MAY CREATE A SAFETY HAZARD AND RISK PROPERTY DAMAGE THIS INCLUDES IMPROPER INSTALLATIONORCONFIGURATION IM PROPERMAINTENANCE UNINTENDED USE AND UNAUTHORIZED MODIFICATION DON...

Страница 4: ... if required by the utility 2 PLANNING 2 1 TECHNICAL SPECIFICATIONS Topic Unit Min Typical Max MISCELLANEOUS PARAMETERS Maximum Microinverters per 20 amp Branch Circuit 240 VAC single phase 208 VAC single phase A 13 11 CEC Weighted Efficiency 240 VAC single phase 208 VAC single phase 97 0 96 5 Static MPPT Efficiency weighted ref EN 50530 99 0 Total Harmonic Distortion 5 Ambient Temperature Range C...

Страница 5: ...ensuring that maximum power available from each PV module is exported to the utility grid regardless of the performance of the other PV modules in the array While an individual PV module in the array may be affected by shading soiling orientation or PV module mismatch each Enphase MicroinverterensurestopperformanceforitsassociatedPVmodule System Monitoring Once you install the Enphase IQ Envoy or ...

Страница 6: ...ording to chapter 2 3 Test Load in accordance with IEC 61215 and Design Load 1 5 in accor dance with UL 1703 Installation using a mounting structure for solar modules Mounting Structure Requirements Requirements for the mounting structure Conforms to the necessary structural requirements Compliant with local snow and wind loads Properly fastened to the ground the roof or the façade Forces acting o...

Страница 7: ...ductorlengthsintheVoltageRiseTechnicalBriefatenphase com support Refer to this brief for voltage rise values in Enphase Q Cables and on how to calculate voltage rise in other wire sections of the system Standard guidelines for voltage rise on feeder and AC branch circuit conductors might not be sufficient for microinverter AC branch circuits that contain the maximum allowable microinverters This i...

Страница 8: ...OSITION OF CLAMPS MM TEST LOAD PUSH PULL PA DESIGN LOAD PUSH PULL PA SAFETY FACTOR IP2 2400 2200 1600 1470 1 5 Distance between outer edge of module and middle of the clamp consider further details below Loads according to IEC 61215 2 2016 and UL 1703 Test procedure according to IEC 61215 2 2016 and UL 1703 Mounting options do not fulfill the requirements of the standards ATTENTION Ä The loads in ...

Страница 9: ... percent 80 percent derating which may be applicable Module Connection Detailed information about interconnecting modules are specified in section 9 Appendix on page 28 NOTE When installing different product versions the lowest minimum permitted reverse current load capacity applies 2 PLANNING 2 6 ELECTRICAL LAYOUT 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Ä Leave modules in their original packaging...

Страница 10: ...er step on modules Ä Do not subject modules to any mechanical stress Ä Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT DANGER Risk of fatal injury due to electric shock Ä Block off the installation zone Ä Keep children and unauthorized individuals away from the solar power system DANGER Risk of fatal injury due to electric shock Ä Ensure that modules and tools...

Страница 11: ... the valid national regulations and safety guidelines for the installation of electrical devices and systems Ä Make sure to take all necessary safety precautions With mod ule or phase voltages of more than 120V the safety extra low voltage range is exceeded Ä Carry out work on the inverter and the wiring with extreme caution Ä Ensure that the modules are disconnected at the inverter prior to separ...

Страница 12: ...s a heat sink Under normal operating conditions the temperature could be 20 C above ambient but under extreme conditions the microinverter can reach a temperature of 90 C To reduce risk of burns use caution when working with microin verters 90 C Ä Only use connector and solar cables provided from Enphase Q Cable please see page 8 Ä Only interconnect connectors of the same type and manufacturer Ä U...

Страница 13: ...e Q CELLS frames and modules reference should be made to local statutes and regulations for specific requirements on grounding The U S National Electrical Code addresses these issues in Article 250 Proper grounding is achieved by bonding all exposed non current carrying metal equipment to the appropriately sized equipment grounding conductor EGC or racking system that can be used for integrated gr...

Страница 14: ...ed by dirt or debris e g plants bird droppings it needs to be cleaned to prevent a loss of performance Maintenance Ä The PV system has to be inspected regularly by certified personnel Ä The time intervals and extent of the inspection can depend on local circumstances e g salt ammonia content in the air high humidity etc The customer operator must inform him herself about time intervals and extend ...

Страница 15: ... shock Do not use Enphase equipment in a manner not specified by the manufacturer Doing so may cause death or injury to persons or damage to equipment Be aware that installation of this equipment includes risk of electric shock The DC conductors of this photovoltaic system are ungrounded and may be energized Always de energize the AC branch circuit before servicing Enphase does not recommend disco...

Страница 16: ...ially explosive environments Do not allow the terminator to come into contact with open flame Fit the terminator cap using only the prescribed tools and in the prescribed manner Use the terminator to seal the conductor end of the Enphase Q Cable no other method is allowed Installation and Operation Manual 2020 Enphase Energy Inc All rights reserved 7 PV Rapid Shutdown Equipment PVRSE This product ...

Страница 17: ...voltage at the site is within range Service Type and Voltage L1 L2 240 V Split Phase 211 to 264 VAC 208 V Single Phase 183 to 229 VAC B Install a junction box at a suitable location on the racking C Provide an AC connection from the junction box back to the electricity network using equipment and practices as required by local jurisdictions Step 2 Position and Connect the Enphase Q Cable A Plan ea...

Страница 18: ... turn only the hex nut to prevent conductors from twisting out of the separator NOTE Turn only the hex nut to prevent conductors from twisting out of the separator G Attach the terminated cable end to the PV racking with a cable clip or tie wrap so that the cable and terminator do not touch the roof WARNING The terminator cannot be re used If you unscrew the nut you must discard the terminator 13m...

Страница 19: ...ips Cable clip B Dress any excess cabling in loops so that it does not contact the roof Do not form loops smaller than 12 cm 4 in diameter Installation and Operation Manual 2020 Enphase Energy Inc All rights reserved 18 Step 8 Ground the ACMs Choose to use grounding clamps or module mounting holes to ground the modules Or you can use a reliable third party grounding system All Methods A Ground the...

Страница 20: ...er to DC Resistance Low Power Off Condition on page 40 The Microinverter LED Installation and Operation Manual 2020 Enphase Energy Inc All rights reserved 20 Step 10 Set Up and Activate Monitoring Refer to the Enphase IQ Envoy Quick Install Guide to install the IQ Envoy and set up system monitoring and grid management functions This guide leads you through the following Connecting the IQ Envoy Det...

Страница 21: ...d the microinverter stops power production and raises this condition This may indicate defective module insulation defective wiring or connectors moisture ingress or a similar problem Although the cause may be temporary this microinverter condition persists until the sensor is manually reset An IQ Envoy is required to clear this condition The condition clears on operator command unless its cause i...

Страница 22: ...ables from the PV module to measure microinverter current This will be under one amp if AC is disconnected K Verify the PV module DC voltage is within the allowable range shown in Specifications on page 6 of this manual Installation and Operation Manual 2020 Enphase Energy Inc All rights reserved 24 L Following the steps in Remove and Replace a Microinverter remove the PV panel from the roof and s...

Страница 23: ...y O Ship the old microinverter to Enphase using the supplied return shipping label Microinverter Communications LED Device Scan button Installation and Operation Manual 2020 Enphase Energy Inc All rights reserved 26 Enphase Q Cable Planning and Ordering The Enphase Q Cable is a continuous length of 12 AWG double insulated outdoor rated cable with integrated connectors for microinverters These conn...

Страница 24: ...horized installer following the requirements of the local electrical utility is allowed to make Grid Profile adjustments NOTE Grid profile changes are applied only after a microinverter is detected In some regions and in some situations microinverter trip points may be adjusted to account for high grid voltage or for local conditions Grid profile management tasks include Set the grid profile for y...

Страница 25: ...pectrum Center Drive Suite 1400 Irvine CA 92618 USA TEL 1 949 748 59 69 EMAIL inquiry us q cells com WEB www q cells us Subject to change without notice Q CELLS Installation manual solar modules Q PEAK DUO BLK G6 _AC_2020 07_Rev02_NA ...

Отзывы: