INSTALLATION AND OPERATION MANUAL SOLAR MODULES DUO-G5.X – HANWHA Q CELLS – EN

INSTALLATION AND OPERATION MANUAL SOLAR MODULES DUO-G5.X – HANWHA Q CELLS – EN

2 PLANNING

2.3  Mounting options

Module Selection

For detailed key electrical data, please refer to the actual 
data sheet referring to the relevant Module (available at 

www.q-cells.com). 

 

Ä

For maximum energy yields, mismatches of specified 

electric current (I

MPP

) of more than 5 % should be avoided 

for all modules connected in series.

Safety Factor

During normal operation, a module may generate a greater 
current and / or higher voltage than that determined under 
standardized test conditions. Please use a safety factor of 
1.25 for the following:

• 

Calculating the voltage measurement values (V

OC

)  of 

components 

• 

Calculating the current measurement values (I

SC

)  of 

conductors

• 

Sizing of control systems connected to the outlets of 
the solar modules 

 

Ä

Please follow the valid national guidelines for the 
installation of electrical systems.

Series Connection

Connection of modules in series is only permitted up to 
the maximum system voltage as listed in the applicable 
data sheet of all the relevant modules to be installed.  

 

Ä

Take into account all possible operating situations and all 
relevant technical norms and regulations when designing 
the system. It has to be ensured that the maximum 
system voltage, including all necessary safety margins, 
is not exceeded. 

 

Ä

Take the voltage limit of the inverter into account when 
determining the maximum number of modules in the 
string.  

Parallel Connection

Modules may be damaged by the occurrence of reverse 
currents (caused by module defects, ground leaks, or 

defective insulation).

 

Ä

Ensure that the maximum reverse current load capacity 
indicated in the data sheet is met. 

In order to limit reverse currents that may occur, we 
recommend using the following safety options:

1)  Layout with a limited number of parallel connected 

strings :

Without undertaking further current blocking measures, 
a maximum of two module strings may be operated in 
parallel on a single inverter or MPP tracker.

2)  Layout with string fuses :

Place fuses for each string of modules at the plus and 
minus ends. Observe the maximum permitted number 

of strings as indicated in the specifications provided by 

the respective string fuse manufacturer and the technical 
guidelines.

NOTE! 

When installing different product versions, the lowest 
minimum permitted reverse current load capacity applies.  

Inverters

Inverters with or without transformers may be used.

2.4  Electrical layout

2 PLANNING

Specifications

MODULE TYPE

MOUNTING 
OPTION

POSITION OF 
CLAMPS* [MM]

TEST LOAD  
PUSH/PULL** 
[PA] 

DESIGN LOAD 
PUSH/PULL** 
[PA] 

SAFETY  
FACTOR

Q.PEAK DUO-G5.X

Q.PEAK DUO BLK-G5.X CL1 / CL3

250 - 450

5400/4000

3600/2670

1.5

FB1 / FB2

345

IP1

-

CL1

0 - 250 
450 - 550

2400/2400

1600/1600

CL2

0 - 250

CL4

0 - 300

CL5

short side: 0 - 250
long side: 300 - 400

4000/4000

2670/2670

MODULE TYPE

MOUNTING 
OPTION

POSITION OF 
CLAMPS* [MM]

TEST LOAD  
PUSH/PULL*** 
[PA] 

DESIGN LOAD 
PUSH/PULL*** 
[PA] 

SAFETY  
FACTOR

Q.PEAK DUO-G5.X

Q.PEAK DUO BLK-G5.X IP2

-

2400/2200

1600/1470

1.5


** 
*** 

Distance between outer edge of module and middle of the clamp. 
Loads according to IEC 61215-2:2016 and UL 1703. 
Test sequence according to IEC 61215-2:2016.

ATTENTION

 

Ä

The loads in the table are related to the mechanical stability of the solar modules. The mechanical stability of the 
mounting system including clamps has to be evaluated by the system supplier. The system installer is responsible 

for the determination of location-specific load requirements.

 

Ä

Ensure, that the subconstruction does not touch the junction box (even under load).

 

Ä

Ensure, that the connection cables of the junction box do not run between laminate and mounting rails.

 

Ä

Ensure, minimum support depth of 15 mm on the back side of the module for IP2, CL2 and CL4. Ensure minimum 
support depth of 10 mm on the front side of the module for IP2.

 

Ä

Module bend under loads. Therefore, sharp objects (e.g. screws) must not be mounted near the module backside.

 

Ä

Use M8 corrosion-proof screws and washers (diameter 

 15.8 mm  or 

 0.62 in) for FB1 and FB2 mounting.

Содержание Q.PEAK DUO BLK-G5.X

Страница 1: ...Valid for Africa Asia Europe Latin America South America Q PEAK DUO G5 X SOLAR MODULE SERIES INSTALLATION AND OPERATION MANUAL ...

Страница 2: ...er Risk of fatal injury Attention Risk of serious injury or damage to property Note Risk of damage to product Safety Regulations In particular the installer as well as the operator of a module is responsible for compliance with all applicable statutory requirements and regulations Ä Ä Unless otherwise specified by any laws or regulations the following stipulations must be upheld at all times durin...

Страница 3: ...ns during set up and installation Q CELLS assumes no liability on the basis of these instructions Q CELLS is only liable in the context of contractual agreements or in the context of accepted guarantees Q CELLS accepts no other responsibility for the functionality and safety of the modules Ä Ä Please observe the instructions for any other sys tem components that may be part of the complete solar p...

Страница 4: ...s acting on the module are relayed to the mounting substructure Ensures sufficient rear ventilation of the module Guarantees long term stability Avoid the usage of different metals to prevent contact corrosion Allows for stress free expansion and contraction due to temperature fluctuations Ä Ä Ensure that no mechanical stresses e g caused by vibra tions twisting or expansion applied to on the modu...

Страница 5: ...g further current blocking measures a maximum of two module strings may be operated in parallel on a single inverter or MPP tracker 2 Layout with string fuses Place fuses for each string of modules at the plus and minus ends Observe the maximum permitted number of strings as indicated in the specifications provided by the respective string fuse manufacturer and the technical guidelines NOTE When i...

Страница 6: ...rely in cool and dry rooms The packaging is not weatherproof DANGER Risk of fatal injury due to electric shock Ä Ä Do not install damaged modules Ä Ä Inform your distributor of any damages immediately 3 1 Safety and transport 3 INSTALLATION NOTE Module damage may occur Ä Ä Never lift or move the module with the connection cables or junction box Ä Ä Carry modules upright and horizontally as shown N...

Страница 7: ...isk of fatal injury due to electric shock Ä Ä Only use dry insulated tools Ä Ä Do not carry out the installation alone Only install undamaged modules and components Ä Ä Do not modify the module e g do not drill any additional holes 3 2 Preparation of installation 3 INSTALLATION Ä Ä Maintain an interval of at least 10 mm between two modules 10mm 1 0 m m Option 2 Ä Ä Install the module at the 4 moun...

Страница 8: ...ime intervals specified by the inverter manufacturer after switching off the inverter DANGER Risk of fatal injury due to electric shock Ä Ä Never open the junction box Ä Ä Do not remove bypass diodes DANGER Risk of fatal injury due to electric shock Ä Ä Never touch live contacts with bare hands Ä Ä Cover connectors by suitable protective caps until installation DANGER Risk of fatal injury due to e...

Страница 9: ...y and safe condition 4 3 Connection of modules 4 ELECTRICAL CONNECTION Ä Ä To avoid complex cabling arrangements it is often advantageous to rotate some modules 180 Ä Ä Module orientation can clearly be identified from the front side by the serial number and barcode labelled behind the module glass on the side with negative connection cable Inverter 180 180 Ä Ä Ensure that all necessary safety and...

Страница 10: ...arly by certified personnel Ä Ä The time intervals and extent of the inspection can depend on local circumstances e g salt ammonia content in the air high humidity etc The customer operator must inform himself about time intervals and extend of necessary inspections Ä Ä Inspections have to be performed especially after extraor dinary events e g storm hail high snow loads etc Ä Ä During the inspect...

Страница 11: ...nallee 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL service q cells com WEB www q cells com Subject to change without notice Hanwha Q CELLS Installation manual solar modules DUO G5 X_2017 10_Rev01_EN ...

Отзывы: