background image

2

3

INSTALLATION AND OPERATION MANUAL SOLAR MODULES DUO-G5.X – HANWHA Q CELLS – EN

INSTALLATION AND OPERATION MANUAL SOLAR MODULES DUO-G5.X – HANWHA Q CELLS – EN

2

3

DOCUMENT REVISION 01
This Manual is valid for Africa, Asia, Europe, Latin America and South America as of July 1

st

 2017 for Q.PEAK DUO G5-X and Q.PEAK DUO BLK-G5.X 

solar modules, and replaces all earlier versions. The X in the module name indicates the product version (0−9).

This manual is subject to change. The data sheets and customer information valid at the point in time when the relevant module was manufactured apply 
to the installation, mounting, and maintenance procedures for the respective solar modules, as far as no updated document is provided. 

With solar modules from Hanwha Q CELLS (hereafter referred 
to as "Q CELLS") you can directly transform the sun’s limitless 
energy into environmentally-friendly solar electricity.
In order to ensure the maximum performance of your Q CELLS 
solar modules, please read the following instructions care-
fully and observe all guidelines. Non-compliance may result 
in damage and/or physical injury.

This installation and operation manual (hereafter also 

referred  to  as  the  “Manual”)  provides  instructions  for 

the safe installation and operation of crystalline solar 
modules.

 

Ä

Please read these instructions carefully before proceeding 
with your installation.

 

Ä

Please retain these instructions for the life of the solar 
modules.

 

Ä

Please ensure that this Manual is available to the operator 
at all times.

 

Ä

This Manual should be given to all subsequent owners 
or users of the solar modules.

 

Ä

All supplements received from the manufacturer should 
be included.

 

Ä

Please observe all other applicable documents.

 

Ä

If your questions are not satisfactorily answered 

 

in the manual, please contact your system supplier. 

Additional information can be found on our website at 
www.q-cells.com. 

Intended Use

This manual is valid for Africa, Asia, Europe, Latin 
America, South America. These instructions contain 
information regarding the safe handling and use of 
quality crystalline solar modules from Q CELLS and their 
installation, mounting, wiring, maintenance and disposal. 

Symbols and Labels

The following symbols and labels are used throughout the 
Manual for ease of use. 

SYMBOL

DESCRIPTION

 

Ä

 

Procedure with one or more steps. 

• 

 

Lists of items.

Ensure that when carrying out a pro-
cedure, you check the results of said 
procedure.
  

Prohibited.
 

Beware of possible danger or damage. 
Categories:

• 

Danger: Risk of fatal injury

• 

Attention: Risk of serious injury 
or damage to property

• 

Note: Risk of damage to product

Safety Regulations

In particular the installer as well as the operator of a 
module is responsible for compliance with all applicable 
statutory requirements and regulations. 

 

Ä

Unless otherwise specified by any laws or regulations, 

the following stipulations must be upheld at all times 
during the installation, operation, and maintenance of 
the solar modules: 

• 

This manual.

• 

Other applicable stipulations (such as country-specific 

regulations for pressure equipment, operational safety, 

hazardous goods, and environmental protection).

• 

Regulations and requirements specific to the system.

• 

Any applicable laws and requirements, in particular 

international,  country  specific,  regional  laws  and 

stipulations governing the planning, installation, and 
operation of solar power systems and work on roofs.

• 

Any valid international, national and regional regulations 
governing work with direct current, especially those 
applicable to the installation of electrical devices and 
systems, and regulations issued by the respective 
energy provider governing the parallel operation of 
solar power systems.

• 

Any  international,  country  specific  and  regional 

accident-prevention regulations.

• 

Other applicable stipulations provided by the relevant 
national institutions regarding safety in the installation 
and operation of electrical items. For example, in 
Germany the Bau-Berufsgenossenschaft (German 
institution for statutory accidence insurance and 

prevention in the building trade).

Qualified & Skilled Personnel

Both, the installer and operator are responsible for 
ensuring that the installation (including connection to 

the grid), maintenance and dismantling are carried out by 
trained  and  qualified  specialists  with  approved  training 
certificates (issued by a state or federal organization) for 

the respective specialist trade.

Electrical  work  may  only  be  performed  by  an  officially 
certified tradesperson in accordance with the stipulations 

applicable in the relevant country with regard to norm and 

regulations (in Germany e.g. DIN norms, VDE regulations) 

and the stipulations of the local grid operator and/or 
energy provider.  

TABLE OF CONTENTS

1  INTRODUCTION  

3

2 PLANNING  

5

2.1  Technical specifications 

 

5

2.2 Requirements 

 

6

2.3  Mounting options  

7

2.4  Electrical layout  

9

3 INSTALLATION 

 

10

3.1  Safety and transport  

10

3.2  Preparation of installation  

12

3.3  Module installation  

13

4  ELECTRICAL CONNECTION  

14

4.1 Safety 

 

14

4.2  Electrical installation safety  

15

4.3  Connection of modules  

16

4.4  After installation  

17

5 GROUNDING 

 

18

6  FAULTS AND DEFECTS  

18

7 DISPOSAL 

 

18

8  MAINTENANCE AND CLEANING  

19

1 INTRODUCTION

Содержание Q.PEAK DUO BLK-G5.X

Страница 1: ...Valid for Africa Asia Europe Latin America South America Q PEAK DUO G5 X SOLAR MODULE SERIES INSTALLATION AND OPERATION MANUAL ...

Страница 2: ...er Risk of fatal injury Attention Risk of serious injury or damage to property Note Risk of damage to product Safety Regulations In particular the installer as well as the operator of a module is responsible for compliance with all applicable statutory requirements and regulations Ä Ä Unless otherwise specified by any laws or regulations the following stipulations must be upheld at all times durin...

Страница 3: ...ns during set up and installation Q CELLS assumes no liability on the basis of these instructions Q CELLS is only liable in the context of contractual agreements or in the context of accepted guarantees Q CELLS accepts no other responsibility for the functionality and safety of the modules Ä Ä Please observe the instructions for any other sys tem components that may be part of the complete solar p...

Страница 4: ...s acting on the module are relayed to the mounting substructure Ensures sufficient rear ventilation of the module Guarantees long term stability Avoid the usage of different metals to prevent contact corrosion Allows for stress free expansion and contraction due to temperature fluctuations Ä Ä Ensure that no mechanical stresses e g caused by vibra tions twisting or expansion applied to on the modu...

Страница 5: ...g further current blocking measures a maximum of two module strings may be operated in parallel on a single inverter or MPP tracker 2 Layout with string fuses Place fuses for each string of modules at the plus and minus ends Observe the maximum permitted number of strings as indicated in the specifications provided by the respective string fuse manufacturer and the technical guidelines NOTE When i...

Страница 6: ...rely in cool and dry rooms The packaging is not weatherproof DANGER Risk of fatal injury due to electric shock Ä Ä Do not install damaged modules Ä Ä Inform your distributor of any damages immediately 3 1 Safety and transport 3 INSTALLATION NOTE Module damage may occur Ä Ä Never lift or move the module with the connection cables or junction box Ä Ä Carry modules upright and horizontally as shown N...

Страница 7: ...isk of fatal injury due to electric shock Ä Ä Only use dry insulated tools Ä Ä Do not carry out the installation alone Only install undamaged modules and components Ä Ä Do not modify the module e g do not drill any additional holes 3 2 Preparation of installation 3 INSTALLATION Ä Ä Maintain an interval of at least 10 mm between two modules 10mm 1 0 m m Option 2 Ä Ä Install the module at the 4 moun...

Страница 8: ...ime intervals specified by the inverter manufacturer after switching off the inverter DANGER Risk of fatal injury due to electric shock Ä Ä Never open the junction box Ä Ä Do not remove bypass diodes DANGER Risk of fatal injury due to electric shock Ä Ä Never touch live contacts with bare hands Ä Ä Cover connectors by suitable protective caps until installation DANGER Risk of fatal injury due to e...

Страница 9: ...y and safe condition 4 3 Connection of modules 4 ELECTRICAL CONNECTION Ä Ä To avoid complex cabling arrangements it is often advantageous to rotate some modules 180 Ä Ä Module orientation can clearly be identified from the front side by the serial number and barcode labelled behind the module glass on the side with negative connection cable Inverter 180 180 Ä Ä Ensure that all necessary safety and...

Страница 10: ...arly by certified personnel Ä Ä The time intervals and extent of the inspection can depend on local circumstances e g salt ammonia content in the air high humidity etc The customer operator must inform himself about time intervals and extend of necessary inspections Ä Ä Inspections have to be performed especially after extraor dinary events e g storm hail high snow loads etc Ä Ä During the inspect...

Страница 11: ...nallee 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL service q cells com WEB www q cells com Subject to change without notice Hanwha Q CELLS Installation manual solar modules DUO G5 X_2017 10_Rev01_EN ...

Отзывы: