
• Step 1 : Mark guideline on floor.
- Bolt : M12~6 x L30mm (Min)
• Step 3 : After assembling Stand Column on
Stand plate, tighten Screw(M8x16, 4point).
4.3 Stand - Mounting Instructions
Installation
I
24
NOTICE
• Please refer to the STAND Installation Manual for installation instructions and precautions.
• The stand must use the frame provided by the manufacturer, All four directions should be
fastened with bolts to the bottom.
Stand Plate
(1ea)
Battery
Inverter
Stand Column
(2ea)
D-Bracket
(2ea)
L-Bracket
(4ea)
Screw M8x16
(8ea)
Screw M6x8
(4ea)
Nut M8
(2ea)
340 mm
430 mm
40 mm
STEP 1
• Step 2 : L-Bracket (Screw M8x16, 4point)
D-Bracket (Screw M6x8, 4point)
STEP 2
STEP 3
[ Figure 4-9 : Stand List ]
• Step 5 : Secure the stand to the floor.
• Step 4 : After tightening the Upper Wall Bracket,
tighten the nut (M8, 2point).
*
Use the Wall Mount Screw
to disassemble it.
STEP 4
STEP 5
M
8
x4
5
,
Washer
(2 point)
M
1
2~
1
6
N
ut,
Washer
(
4Poi
n
t)