background image

23

 

Operating Mode

7.2  Off-Grid Mode

Daytime Off-Grid

 

PV Power > Load Power

: The PV power is preemptively supplied to the household load (Critical Load), and 

then it charges the battery. Then, when the battery is fully charged, the inverter lowers the PV power to 

generate as much as the household load (Critical load) power.

 

PV Power < Load Power

: If the PV power is less than the household load (Critical load + Main Load) power, 

the battery discharges to supply the short energy to the critical load. If PV + battery power is less than the load 

power, the inverter stops operating.

Q.VOLT

Q.SAVE

With current

No current

Charging

Discharging

Critical Load

Main Load

PV 

Inverter

Energy 

Meter

Recloser

Grid

PV power generation

Nighttime Off-Grid

While the battery discharges, it supplies energy to the load. If the battery power is not enough to supply energy 

to the household load (Critical Load), the inverter stops operating. 

Q.VOLT

Q.SAVE

With current

No current

Discharging

Critical Load

Main Load

PV 

Inverter

Energy 

Meter

Recloser

Grid

Содержание Q.HOME CORE A5

Страница 1: ...USER MANUAL Q HOME CORE A5...

Страница 2: ...cription 8 3 1 Q VOLT Overview 8 3 2 Q SAVE Overview 9 3 3 Specifications 10 4 Power On Off 12 4 1 Turning On Q HOME CORE 12 4 2 Using the Dark Start button 12 4 3 Turning Off Q HOME CORE 13 5 LED Sta...

Страница 3: ...mless Transfer 24 8 Features 25 8 1 Protection 25 8 2 Power Derating 25 8 3 Overload Operation 25 8 4 Power Quality Response 26 8 5 Battery Management 27 8 6 Demand Response Modes DRMS 28 8 7 Dark Sta...

Страница 4: ...ollow the instructions in this manual 1 2 Target Group Electricians and qualified technicians who are allowed to install and to connect electrical systems 1 3 Symbols Used in This Manual WARNING This...

Страница 5: ...information on proper use of this device contact the Qcells Service Hotline 2 2 Safety Precaution The following safety precautions and the warning messages described in this section must be observed...

Страница 6: ...ation and wiring 2 3 Earth Fault Alarm When an earth fault occurs the inverter stops operation and the buzzer operates for 2 minutes and the earth fault code is notified to the installer and administr...

Страница 7: ...duct 2 Disposal of Q SAVE When this crossed out wheeled bin symbol is attached to batteries accumulators of your product it means they are covered by European Directive 2006 66 CE This symbol may be c...

Страница 8: ...er 8 Communication port 2 LED indicator 9 BMS Connector 3 Inner cover 10 USB Port 4 Wiring cover 11 LAN DRM port 5 Battery power connector 12 Wi Fi LTE Dongle port 6 PV switch 13 Dark Start switch 7 G...

Страница 9: ...oduct Description 3 2 Q SAVE Overview 7 8 9 2 1 3 5 6 4 1 Front cover 6 BMS board 2 Inner cover 7 Battery DC Switch 3 Wiring cover 8 Battery Power Connector 4 Battery module 9 BMS Connector 5 Relay bo...

Страница 10: ...update Energy Management System Integrated Country of Manufacturer Republic of Korea GRID DATA AC Max Apparent Power Rated Output Power kVA kW 5 5 Nominal Voltage Range V 230 180 to 260 Nominal Grid...

Страница 11: ...tery Pack 5 0 5 0 2 3 Battery Pack Converter Technology Non isolated Rated Battery Voltage Battery Voltage Range VDC 202 8 168 0 to 228 2 Maximum Charge Discharge Current A 16 9 20 for each Q SAVE uni...

Страница 12: ...3 Turning on the battery DC switch 4 2 Using the Dark Start button To turn on Q HOME CORE when there are no PV and Grid Press the Dark Start button for about 10 seconds Once the power is supplied and...

Страница 13: ...ed on to avoid deep discharge of the battery Alternatively the device can also be switched off completely To turn off the Q HOME CORE 1 Turning off the battery DC switch 2 Turning off the PV switch 3...

Страница 14: ...discharging in online mode Flashing Standby in online mode Magenta Solid Charging or discharging in offline mode Flashing Standby in offline mode Green Solid Charging or discharging in off grid mode F...

Страница 15: ...4 4 or higher iOS 10 0 or higher 1 Log In After you install and open the app you have to select the location first and then log in 1 Select the location 2 Tap Select 3 Enter your ID and password and t...

Страница 16: ...has a 4 digit number created by the installer Please check your email or contact your installer if you have not received it 4 Tap Create Account 3 Log Out 1 Tap My Page at the bottom right of the scre...

Страница 17: ...y Provides energy consumption production data and graphs 4 My Page Provides account app installation settings and FAQ 6 3 Home Tab Energy Flow Dashboard Updates the PV generation battery charging disc...

Страница 18: ...n range considering situations such as blackout By setting the Energy Backup option you can set the battery to discharge only up to the specific amount under normal circumstances and backup energy can...

Страница 19: ...asis To set the Time based Mode 1 Tap Products on the bottom of the screen 2 Tap Energy Storage 3 Tap Inverter 4 Tap Inverter Settings 5 Select Time based Mode 6 Choose a date and tap button to add a...

Страница 20: ...rge and annual energy report Solar PV Produced Energy Home Consumed Energy Battery net energy Discharged Energy POS Charged Energy NEG Grid net energy Imported Energy POS Exported Energy NEG Battery S...

Страница 21: ...ect the desired tab General Provides the general information such as the serial number Home ID etc Installer Provides the installer contact information Address Provides the installation location 6 8 L...

Страница 22: ...is less than the household load Critical load Main Load power the battery discharges to provide the short household load energy If the PV battery power is less than the load power the short load powe...

Страница 23: ...power the battery discharges to supply the short energy to the critical load If PV battery power is less than the load power the inverter stops operating Q VOLT Q SAVE With current No current Charging...

Страница 24: ...power is restored during the off grid operation the inverter is automatically connected to the grid system after a certain period and operates in the on grid mode Q VOLT Q SAVE Q VOLT Q SAVE Seamless...

Страница 25: ...i islanding protection 8 2 Power Derating Q HOME Core limits the output power on over temperature to protect the inverter from overload or other potential errors If the temperature does not drop beyon...

Страница 26: ...d only in Australia New Zealand and Germany INVERTER POWER LEVEL P fULCO fTransition fPmin 100 49 0 FREQUENCY Hz 49 5 50 0 50 5 51 0 51 5 52 0 52 5 100 0 MAX INVERTER POWER LEVEL P Power Input Power O...

Страница 27: ...tential difference exceeds the threshold voltage the PCS automatically starts cell balancing control to prevent the battery from damage due to the potential difference among battery cells Parallel Con...

Страница 28: ...ubject to the constrains from other active DRMs DRM 5 The export power from the grid is 0 DRM 6 The export power from the grid is no more than 50 of the rated power DRM 7 The export power from the gri...

Страница 29: ...ng the Cover CAUTION Qualified Person Only If Q HOME CORE is dirty clean the enclosure the enclosure cover and the LED using only clean water and a soft cloth Ensure that the Q HOME CORE is free of du...

Страница 30: ...30 10 Full Warranty Download the Q HOME CORE warranty document from the Qcells web page or the following link or the QR code and make sure to read it carefully...

Страница 31: ...31 MEMO...

Страница 32: ...lee 17 21 Bitterfeld Wolfen OT Thalheim 06766 Germany Hanwha Q CELLS Australia Pty Ltd Suite 1 Level 1 15 Blue Street North Sydney NSW 2060 Australia TEL WEB 49 3494 6699 23333 www q cells eu TEL 61 0...

Отзывы: