INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO-G9.X – Q CELLS
INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO-G9.X – Q CELLS
Specifications
MODULE TYPE
MOUNTING
OPTION
POSITION OF
CLAMPS* [MM]
TEST LOAD
PUSH / PULL** [PA]
DESIGN LOAD
PUSH / PULL** [PA]
SAFETY
FACTOR
Q.PEAK DUO-G9
Q.PEAK DUO-G9+
Q.PEAK DUO BLK-G9
Q.PEAK DUO BLK-G9+
CL1a
150 - 450
5400 / 4000
3600 / 2660
1.5
FB1
346.5
FB2
346.5
3300 / 4000
2200 / 2660
IP1
-
3300 / 3300
2200 / 2200
CL1a
20 - 550
2400 / 2400
1600 / 1600
CL1b
20 - 550
CL2a (with rails)
20 - 300
CL2b (without
rails)
20 - 300
CL3
250 - 450
4000 / 4000
2660 / 2660
CL5
short side: 100 - 250
long side: 300 - 450
3800 / 3800
2530 / 2530
CL6b
short side: 100 - 250
middle: 640 - 1030****
6000 / 4000
4000 / 2660
Ä
The below mounting options are only possible under certain conditions.
MODULE TYPE
MOUNTING
OPTION
POSITION OF
CLAMPS* [MM]
TEST LOAD
PUSH / PULL***
[PA]
DESIGN LOAD
PUSH / PULL***
[PA]
SAFETY
FACTOR
Q.PEAK DUO-G9
Q.PEAK DUO-G9+
Q.PEAK DUO BLK-G9
Q.PEAK DUO BLK-G9+
IP2
-
2400 / 2200
1600 / 1460
1.5
*
**
***
****
Distance between outer edge of module and middle of the clamp; consider further details below.
Loads according to IEC 61215-2:2016 and UL 61730.
Test procedure according to IEC 61215-2:2016 and UL 61730. Loads for these mounting options do not fulfill the requirements of the standards.
Rails must not be under the junction box.
ATTENTION
Ä
The loads in the table are related to the mechanical stability of the solar modules. The mechanical stability of the mounting
system including clamps has to be evaluated by the system supplier. The Q CELLS listed test load values were determined
with the following clamp parameters: clamp width = 40 mm and clamp depth = 10 mm. The system installer is responsible for
the determination of location-specific load requirements.
Ä
CL1a at high loads (5400 / 4000 Pa): The clamp position is variable in the given range but the distance between the clamps
along the long side of the module (span) must not be larger than 1070 mm.
Ä
CL1b: Using of short mounting rails are permissible, if they overlap with the module less than 210 mm. Minimum height of the
short mounting rails should be ≥ 35 mm (clearance between frame bottom edge and roof top).
Ä
Ensure, that the subconstruction does not touch the junction box (even under load). Ensure that the clamps or insertion profiles
etc. do not touch the glass (even under load).
Ä
Ensure, that the connection cables of the junction box do not run between laminate and mounting rails.
Ä
A minimum support depth of 15 mm is required on the back side of the module for IP1, IP2, CL2b, CL3 and CL6b. The minimum
required support depth on the module backside for CL5 is 10 mm on long frame side and 15 mm on short frame side. For IP1
and IP2 the minimum support depth on the front side of the module should be 10 mm.
Ä
CL1a, CL2a and CL3: Ensure that module frame is fixed directly on the rail of the substructure (no spacer allowed between
the module and substructure).
Ä
Module bends under load. Therefore, sharp objects (e.g. screws) must not be mounted near the module backside.
Ä
Unbalanced snow loads (e.g. snow overhangs, snowdrifts) which result in locally significantly increased loads must be removed
or avoided by technical measures.
Ä
Use M8 corrosion-proof screws and washers (diameter ≥ 15.8 mm or ≥ 0.62 in) for FB1 and FB2 mounting. Mounting screws
and washers should have the same material properties.
2 PLANNING
2 PLANNING
2.3 MOUNTING OPTIONS
2.3 MOUNTING OPTIONS