Q CELLS solar modules are known for a long operating life and 
minimal maintenance effort and expense. Dirt and grime are 
usually washed away by rain. If the module is fully or partially 
shaded by dirt or debris (e.g., plants, bird droppings), it needs 
to be cleaned to prevent a loss of performance.

Maintenance

 

Ä

The PV system has to be inspected regularly by certified 
personnel

 

Ä

The time intervals and extent of the inspection can depend on 
local circumstances (e.g. salt, ammonia content in the air, high 
humidity etc.). The customer / operator must inform himself 
about time intervals and extend of necessary inspections.

 

Ä

Inspections have to be performed especially after extraordinary 
events (e.g. storm, hail, high snow loads etc.)

 

Ä

During the inspections it has to be checked that the compo-
nents are secure, undamaged and clean

Cleaning

WARNING! 
Risk of injury due to hot and live modules!

 

Ä

Only clean modules that have cooled down.

 

Ä

Do not carry or wear any electrically conductive parts.

WARNING! 
Risk of falling due to unsecured access! 

 

Ä

Never access the installation area alone or without taking 
adequate security precautions.

 

Ä

Please commission a trade specialist.

NOTE! 
Module surface damage may occur! 

 

Ä

Remove snow and ice carefully without force (e.g. with a 
very soft broom).

 

Ä

Do not scratch off dirt.

 

Ä

Rinse dirt (dust, leaves, etc.) off with lukewarm water or use an 
alcohol based glass cleaner. Do not use abrasive detergents 
or surfactants.

 

Ä

Use a soft cellulose cloth (kitchen roll) or sponge to carefully 
wipe off stubborn dirt. Do not use micro fleece wool or 
cotton cloths.

Isopropyl alcohol (IPA) can be used selectively to remove 
stubborn dirt and stains within one hour after emergence.

 

Ä

Please follow the safety guidelines provided by the IPA 
manufacturer.

 

Ä

Do not let IPA run down between the module and the frame 
or into the module edges.

Note! Module damage may occur!

 

Ä

Do not clean modules with water if there is a 
risk of frost.

8  MAINTENANCE AND CLEANING

 

Ä

Free the substructure from any dirt and debris 
(leaves, bird nests, etc.).

 

Ä

Remove dirt with lukewarm water or alcohol 
based glass cleaner, a broom, or a soft cloth.

 

Ä

Do not use surfactants, rotating brushes, 
scrapers, or any high-pressure water cleaning 
equipment.

Содержание DUO-G9 Series

Страница 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO G9 X solar module series Valid for Africa Europe LatinAmerica South America ...

Страница 2: ...ipulations such as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable laws and requirements in particular inter national country specific regional laws and stipulations governing the planning installation and operation of solar power systems and work on roofs Any vali...

Страница 3: ...quirements prior to installation of the solar power system Your financial success depends on the fulfillment of these requirements Other applicable documents In addition to this Manual following technical information are relevant DOCUMENT TYPE Product data sheet Packaging and transport information Fig 1 External dimensions and components for Q PEAK DUO G9 Q PEAK DUO G9 Q PEAK DUO BLK G9 and Q PEAK...

Страница 4: ...ls to prevent contact corrosion Allows for stress free expansion and contraction due to temperature fluctuations Ä Ensure that no additional forces are applied through the mounting system into the module except for the wind and snow loads Additional forces and moments of torque at the mounting positions caused by torsions displacements or vibrations in the mounting system are not allowed Ä Ensure ...

Страница 5: ...ameters clamp width 40mm and clamp depth 10mm The system installer is responsible for the determination of location specific load requirements Ä CL1a at high loads 5400 4000Pa The clamp position is variable in the given range but the distance between the clamps along the long side of the module span must not be larger than 1070mm Ä CL1b Using of short mounting rails are permissible if they overlap...

Страница 6: ...everse currents caused by module defects ground leaks or defective insulation Ä Ensure that the maximum reverse current load capacity indicated in the data sheet is met In order to limit reverse currents that may occur we recommend using the following safety options 1 Layout with a limited number of parallel connected strings Withoutundertakingfurthercurrentblockingmeasures amaximum of two module ...

Страница 7: ...odule damage may occur Ä Never step on modules Ä Do not subject modules to any mechanical stress Ä Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger Risk of fatal injury due to electric shock Ä Block off the installation zone Ä Keep children and unauthorized individuals away from the solar power system Danger Risk of fatal injury due to electric shock Ä E...

Страница 8: ...rom the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Ä Please be aware of that the entire open circuit voltage is active even at low levels of solar irradiation Ä Pleasefollowthevalidnationalregulationsandsafetyguidelines for the installation of electrical devices and systems Ä Please make sure to tak...

Страница 9: ...el see page 3 Ä Ensure correct polarity Ä Use solar cables for the connection at the junction box outlet Ä Only interconnect connectors of the same type and manufacturer Ä Use minimum 4mm2 copper wires insulated for a minimum of 90 C for field connections Note Module damage may occur Ä Ensure that the cabling is not under mechanical stress Comply with bending radius of 60mm Ä Ensure that the cable...

Страница 10: ...bling is not exposed and or hanging and is protected from dirt moisture and mechanical friction 4 ELECTRICAL CONNECTION 4 4 AFTER INSTALLATION Ä No dry cleaning or use of rotating brushes Ä Modules must be cleaned manually and only with sufficient water Protective Grounding Ä The modules must be grounded in accordance with the local statutory regulations DANGER Risk of fatal injury due to electric...

Страница 11: ...arry or wear any electrically conductive parts WARNING Risk of falling due to unsecured access Ä Never access the installation area alone or without taking adequate security precautions Ä Please commission a trade specialist NOTE Module surface damage may occur Ä Remove snow and ice carefully without force e g with a very soft broom Ä Do not scratch off dirt Ä Rinse dirt dust leaves etc off with l...

Страница 12: ...lee 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL sales q cells com WEB www q cells com Subject to change without notice Q CELLS Installation manual solar modules Q PEAK DUO G9 X_2021 08_Rev03_EN ...

Отзывы: