Annex 3:
Installation and System Turn ON Progress List
Tick after
completion
No.
Item
Remark
☐
1
The environment is meeting all technical requirements.
3.3.1
Cleaning
3.3.2
Temperature
3.3.3
Radiating System
3.3.4
Heating System
3.3.5
Fire-extinguisher System
3.3.6
Grounding System
Refer to chapter
3.3
☐
2
Battery rack is installed follow the technical
requirements.
Refer to chapter
3.5.3.
☐
3
Control Module (BMS) and Battery Module are installed
well. And install the rack metal strip.
Refer to chapter
3.5.4.
☐
4
The MBMS are installed well. (If configured.)
Refer to chapter
3.5.5.
☐
5
The Ethernet Switch is installed well. (If configured.)
Refer to chapter
3.5.6.
☐
6
Connect the AC power cables from BMS, MBMS and
Ethernet Switch to the AC “OUT PUT” socket of the UPS.
(If configured.)
Refer to chapter
3.6.2.1 or 3.6.2.2.
☐
7
Connect
External Power Cable +/-
between each BMS
to the PCS or confluence cabinet.
Refer to chapter
3.6.2.1 or 3.6.2.2.
☐
8
Connect power cables of each battery string.
Refer to chapter
3.6.2.1 or 3.6.2.2.
☐
9
Connect communication cables of each battery string.
Refer to chapter
3.6.2.1 or 3.6.2.2.
☐
10
Set up ADD switch of every BMS and the MBMS (Address
Assignment).
Refer to chapter
3.6.3.
☐
11
Connect external communication cables from BMS to
Ethernet Switch, MBMS or another
Refer to chapter
3.6.2.1 or 3.6.2.2.
☐
13
Connect the communication cable from MBMS to the
PCS.
Refer to chapter
3.6.2.1 or 3.6.2.2.
☐
14
Double check every
power cables
,
communication
cables
installed well. And
ADD Switches
are setting right.
Refer to chapter
3.6.2.1 or 3.6.2.2
and 3.6.3.