CONQUEST
®
WATER HEATER
3
PV500-71 02/16
10.
EOS (Electronic Operating System)
10.1 Touch Screen User Interface
10.2 Status Field Display
10.3 Operational Sequence Field Display
10.4 View Menu (Home Screen - Default Display)
10.5 Control System Menus
10.6 Changing the Operating Set Point
10.7 Setting the Real Time Clock
10.8
Scheduled
Setback
10.9 Using the Manual Override Menu
10.10 Potentiometer (Operating Set Point for Stand Alone Operation)
10.11 Using Tool Box Menu
11.
Communications and Diagnostics
11.1 Indicators
11.2 Alarm Messages – Diagnostic Codes (Flashes)
11.3 Replacing
the
Fuse
11.4 Self-Check/Control
Failure
11.5 System
Safety
Checks
11.6 Flame Current Measurements
11.7 Non-Volatile
Lockout/Manual
Reset
11.8 ID
Card
12. Network
Menu
12.1 EOS register List
12.2 Error
Codes
13.
Remote Connections – Terminal Strip
13.1 Making BMS/BAS Remote Connection for Analog and Binary Signals
13.2
Terminal
Functions
14. Sequence
of
Operation
15. Initial
Startup
15.1
Initial
Startup
Requirements
15.2 Tools and Instrumentation Required
15.3
Resources
15.4 On Site Considerations
15.5
Pre-Startup
Checklist
15.6
Startup
Procedure
16.
Potentiometer (Operating Setpoint for Stand Alone Operation)
17.
NSF Food Service Installation Guidelines
18. Troubleshooting
Procedure
18.1 General
Troubleshooting
18.2 LED
Error
Code
Listing
19. Replacement
Parts
19.1 Burner
Assemblies
19.2 Control
Panel
Components
19.3 Drain Valve –T&P Relief Valve – Integral Circulating Pump Assembly
19.4 Condensate Drain Trap and Optional Condensate Neutralizer
19.5 Component Wiring and Conduit Routing Details
20. Periodic
Maintenance
21. Recommended
Maintenance
Schedule
22.
Requirements for the Commonwealth of Massachusetts