Troubleshooting 
 

Problem 

Possible Cause 

Corrective Action 

Valve does not 
cycle 

- Air pressure to air section too low 
- Packing nut is too tight 
 
- Stroke adjustment bolt is bottomed 
out 
- Material is cured in the valve 
- Valve was assembled w/o 
lubricating the O-ring seals 

- Increase air pressure to 60-100 psi 
- Loosen packing nut until valve just 
begins to cycle, retighten 
- Back out stroke adjustment bolt by 
turning it counter-clockwise     
- Disassemble and clean valve 
- Disassemble valve, lubricate seals and 
re-assemble 

Material leaks 
from mixer 

- Packing nut is too tight 
- Needle and/or seat are worn 
- Air bubble trapped in fluid body or 
static mixer 

- Loosen packing nut 
- Replace parts as necessary 
- Flip valve upside down and cycle 
until air bubbles are removed  

Valve leaks from 
mid-section 

- Packing nut is loose 
- Packing is worn 

- Tighten packing nut until snug 
- Replace packing 

Valve does not 
dispense 
anything 

- Fluid pressure is too low 
- Material cured in fluid section 
- Stroke adjustment bolt is set too 
low 

- Increase fluid pressure 
- Disassemble and clean valve 
- Back out stroke adjustment bolt by 
turning it counter-clockwise 

Air bubbles in 
fluid 

- Valve not properly purged 
 
- Problem with fluid delivery system 

- Flip valve upside down and cycle 
until air bubbles are removed 
- Diagnose and repair. 

Dispense rate too 
fast 

- Stroke Adjustment bolt set out too 
far 

- Turn stroke adjustment bolt clockwise 

Dispense rate too 
slow 

- Stroke Adjustment bolt set in too 
far 

- Turn stroke adjustment bolt counter-
clockwise 

 
 
 
 
 
 
 
 
 
 
 
 

Содержание PC100

Страница 1: ...PC100 TWO COMPONENT DISPENSE VALVE Version B12 1403 Operation Manual 1 MUSTANG DRIVE COHOES NY 12047 PHONE 518 371 2684 FAX 518 371 2688 info pva net www pva net ...

Страница 2: ... Part A and part B fluids will flow into the valve separately and out of the valve separately into a disposable static mixer No disassembly and cleaning of the valve is required at the end of the day The PC100 has a divorced design comprising of two major sections These include 1 Two air sections red anodized portions 2 Fluid section stainless steel portion The separate air sections are aluminum b...

Страница 3: ... the midsection of the valve are air to close the valve The ports located closest to the mid section of the valve are air to open the valve Air supplies used to open and close the valve should be tied to the same solenoid to maintain uniform control Quick connect air fittings are typically supplied with the PC100 to fit 5 32 tubing Note that the valve should be normally in the closed position Flui...

Страница 4: ...can be seen going up and down in the center simultaneously Note If the valve is not cycling properly refer to the Troubleshooting section 4 When the fluid delivery system is connected to the valve pressurize the fluids to be dispensed 5 Once again cycle the valve open to purge Part A and B should begin to flow separately out of the fluid manifold 1 continue dispensing until air is removed 6 Check ...

Страница 5: ...ing removal that there are springs 17 forcing the air sections away from the fluid section 6 Pull the air sections red anodized portions away from the fluid section stainless steel portion 7 Clean off the tip of the stainless steel needles 3 8 From the fluid section of the valve unthread and remove the packing nuts 6 and the packing s 5 9 Using a 3 32 Allen Key remove the eight machine screws 24 t...

Страница 6: ...on the inside groove of the stroke adjust bolts 19 3 Thread the stroke adjustment assemblies into the upper air bodies 11 4 Mount the first two 014 Buna o rings 9 on the ends of the upper air bodies 11 and the final two 008 Buna o rings 12 on the end groove of the stroke adjust bolts 19 Back out the stroke adjusts by turning them counter clockwise to the end of their travel 5 Drop the needles 3 in...

Страница 7: ...oke adjust bolts 19 by turning them counter clockwise until the end of their travel 2 Apply a small amount of silicone grease to the end of the needles 3 and insert them into the packing nuts 6 and slide the two sections together 3 Align the air holes of the air sections on the same face as the 1 8 npt fluid inlets of the fluid section then connect the sections using the four machine screws 13 tig...

Страница 8: ......

Страница 9: ......

Страница 10: ... 8 V201 Lower Air Body 2 9 VLV 014B O Ring Buna 4 10 V202 Piston 2 11 V228 Upper Air Body 2 12 VLV 008B O Ring Buna 4 13 SH5 40x2 0 Cap Screw 4 14 SH5 40x2 25 Cap Screw 4 15 VLV 006K O Ring Kalrez 2 16 VLV 004B O Ring Buna 2 17 V050 Spring 2 18 V001 Set Screw 2 19 V230 Stroke Adjust 2 20 V229 Lock Nut 2 21 VLV 010K O Ring Kalrez 2 22 V007 Plug 2 23 165 38NWF Retaining Nut for static mixer 1 24 SH5...

Страница 11: ...sen packing nut Replace parts as necessary Flip valve upside down and cycle until air bubbles are removed Valve leaks from mid section Packing nut is loose Packing is worn Tighten packing nut until snug Replace packing Valve does not dispense anything Fluid pressure is too low Material cured in fluid section Stroke adjustment bolt is set too low Increase fluid pressure Disassemble and clean valve ...

Страница 12: ...es extend only to the original purchaser Third party warranty claims will not be honored at any time Prior to returning a product for a warranty claim a return authorization must be obtained from PVA s customer service department Authorization will be issued either via the telephone facsimile or in writing upon your request To qualify as a valid warranty claim the defective product must be returne...

Отзывы: