Operation of the PVPM
Page 13
Display results
Display I-V-curve
Add entry
Previous page
Next page
Confirm, „OK“
6.10 Measurement
Please pay attention to the safety hints in chapters 4+6 and factors affecting measurement accuracy in chapter
7.
The measurement can be started from the PVPM or from a connected PC (see chapter 11). The measurement
should not be started before the solar generator and the necessary sensors are connected properly. The I-V-
curve measurement will take up to 2 seconds, than the calculated results will be displayed immediately on the
PVPMs display (or on the PC).
Opens sub-page for measurement
6.10.1 Start measurement
This button activates a single measurement of the I-V-curve. The measurement runs automatically,
errors will be reported and the results as Ppk, Rs and I-V-curve are displayed on the screen.
6.10.2 Archive
This button enables you to retrieve data of already made measurements. The data-sets are listed
according to the creation date.
Goes to next/previous line in the list.
Selects next/prior page
Select a file with “OK”, exit dialog with “Abort”
Use the button “Delete” to delete the selected data-set from PVPM memory. Caution: this operation is
not reversible!
PVPM 1000X / 1040X
User Manual
PV-Engineering GmbH