6
7
6 | M16MI366 - A04 - 07/18
M16MI366 - A04 - 07/18 | 7
INSTALLATION AND MAINTENANCE OF YOUR TOWEL RAIL
EN
2. MOUNTING INSTRUCTIONS OF YOUR TOWEL RAILS
To make the most of your towel rail and for greater comfort, we would ask you to take the following
recommendations into account:
2.1 Positioning
. Radiator can be placed in volume 2 of bathroom if it is not possible to reach the switches or control
device from the bathtub or shower.
. It is not allowed to place the radiator in volume 1.
· The radiator should be mounted on a vertical wall with the connection cord at the bottom of the radiator,
· The lower part of the radiator must be within a minimum distance of 150mm from the ground,
· The radiator must not be installed underneath a power outlet,
· It is recommended to perform the installation, if possible, close to locations with high heat losses
(windows etc)
fig. 1
fig. 2
For the correct installation of radiators it is essential that the fixing of the radiator
is carried out in such a way that it is suitable for intended use AND predictable
misuse. A number of elements need to be taken into consideration including the
fixing method used to secure the radiator to the wall, the type and condition of
the wall itself, and any additional potential forces or weights that may happen to
be applied to the radiator, prior to finalising installation.
2.2 Brackets
• The towel rail must be installed on a vertical wall using the wall mounts supplied and screws suited to
your type of wall.
• The towel rails’ mounting components are adjustable vertically, horizontally and as regards depth (see
exploded diagram in the box), which makes correct installation easier. Positioning can be seen from
the figure on the drawing page.