16
Installation & Operation Manual
Copyright © Puretec Pty Ltd 2018
Now programming is completed (if required) you are ready to start the system.
1. Fill the brine tank with ‘water softener’ salt to approximately half full. (salt
not included).
This will require approximately 60kg (this is only required initially).
2. Add approximately 15 litres of water to the salt in the brine tank. This is only required
for the initial setup.
Note: The water level will drop significantly after the first backwash, and may
disapppear below the salt line. This is normal and no extra water will be required.
3. Open the nearest tap downstream of the filter system (after the filter system).
4. Allow water to flow through the system slowly, and allow all air to escape out of the
closest tap. Wait until the water is flowing out of the tap and then increase the flow
slowly up to full flow. Allow to run for 5 - 10 minutes.
5. Close the opened tap and check for leaks.
6. Conduct a full manual regeneration.
7. Your system is ready for use.
MODEL
CAPACITY OF SYSTEM (L) WITH DIFFERENT HARDNESS LEVELS
100 mg/L
200 mg/L
300 mg/L
400 mg/L
500 mg/L
MUL35-E3
1967
983
655
491
393
MUL50-E3
2753
1376
917
688
550
MUL70-E3
3933
1966
1311
983
786
Regeneration
Start-up
Operation
E3 Valve
(Regeneration Time: 90 mins)
This will adjust regeneration automatically once you have entered the correct hardness level
in the programming section.
Содержание Multitrol MUL-E3 Series