background image

07

DRINKING WATER SYSTEM

4

2

1

3

11.Take tubing white. Wear the concave type screw on tubing white and insert the

tubing shroud as shown in the picture. Connect the tubing top with the faucet
end. Then connect the tubing end to the last stage filter (as point 4 on page 07)

12.Make sure that you complete No. 1 to No. 11. If so, switch on water supply and

plug in electricity.

PS. Do not use drink water from the first made water in the tank.

RO800 800GPD Light Commercial

RO800 800GPD Light Commercial

Tubing connection diagram

1

2

3

4

In

To water storage tank

Drain out

To faucet

Faucet

Tank

Drain out

Input water

Installation diagram

Содержание RO800 800GPD Light Commercial

Страница 1: ...s Selections 04 Cartridge filters 05 The parts of RO 08 Installation diagram 13 Change filters 14 Change RO membrane 15 Operation regulations 17 FAQ 18 Maintenance checking list 19 Memo 07 Tubing connection diagram USER S MANUAL Thank you very much for selecting Pure Pro Water Corp In order to bring the best use of your system please read the user s manual carefully before installation and follow ...

Страница 2: ... and selenium With your own RO water filter system under your sink working for you twenty four hours a day you can have as much purified water at the touch of a finger whenever you want it Free to use all you want clean safe water on tap and no more trips to the store Specifications Production 800GPD NSF Standards water storage tank 20 gallons Operation pressure 10 125 psi Available in 110 volt 22...

Страница 3: ...ar under natural breakdown The membrane has one year pro rated guarantee There are four major variables to consider 1 The greater the water pressure the better water quantity and quality it produced Water pressure of 60 PSI is ideal 2 76 F is the ideal water temperature for R O 40 F water will cause the production of R O water to fall to half of that at 76 F The maximum water temperature recommend...

Страница 4: ...ter will start to run from the faucet slowly D Let the water run for at least 30 minutes This flushes the carbon filters on first time use E After initial flushing open the shut off valve on the tank and close the sink top faucet F Tank will now full of water usually 2 to 3 hours after the tank has filled Open the sink top faucet and drain all water until the storage tank is empty and there is onl...

Страница 5: ... contaminants pesticides and chemicals that contributed to taste and odor Made in USA High rejection TFC type membrane with the capacity of producing 80 gallons per day This membrane removes the following hard water contaminants that may be present in your water lead cooper barium chromium mercury sodium cadmium fluoride nitrite nitrate and selenium NSF approved This post carbon filter is designed...

Страница 6: ...er housing 2nd stage filter housing 3rd stage filter housing Electronic solenoid valve Post carbon filter RO membrane housing RO membrane housing RO membrane housing RO membrane housing RO membrane housing Change membrane 4 Loose the Jaco fitting anti clockwise 5 Open the RO membrane housing anti clockwise 6 Take out the old RO membrane with a handy tool 7 Insert a new RO membrane 1 Unplug electri...

Страница 7: ...ilters let water run for about 15 minutes to clear the filters RO800 800GPD Light Commercial RO800 800GPD Light Commercial Build in electrical shut off valve Booster pump Transformer Flow restrictor PE brick for drain out Booster pump Booster pump Booster pump Transformer Transformer RO system main housing bracket RO membrane housing RO membrane housing The parts of RO800 Change filters 8 After ch...

Страница 8: ...tubing end to the last stage filter as point 4 on page 07 12 Make sure that you complete No 1 to No 11 If so switch on water supply and plug in electricity PS Do not use drink water from the first made water in the tank RO800 800GPD Light Commercial RO800 800GPD Light Commercial Tubing connection diagram 1 2 3 4 In To water storage tank Drain out To faucet Faucet Tank Drain out Input water Install...

Страница 9: ...he jaco fittings 2 Turn off the water supply Loosen the stainless steel pipe connector PRO RE NG WA TE R SY ST EM 3 Get feed water connector and connect it to the stainless steel pipe as in the picture 2 DRINKING WATER SYSTEM PURE PRO REVERSE OSMOSIS SYSTEM 11 08 PURE PRO REVERSE OSMOSIS SYSTEM RO800 800GPD Light Commercial RO800 800GPD Light Commercial Jaco nuts Cold Installation diagram Installa...

Страница 10: ...oint 3 on page 07 4 Get deliver valve and seal it with Teflon tape for 14 circles Then connector it with the feed water connector 5 Get tubing white connect it with deliver valve and the inlet water supply as point 1 on page 07 DRINKING WATER SYSTEM DRINKING WATER SYSTEM 7 Take tubing white connect it to the deliver valve and the inlet water to storage tank as point 2 on page 07 09 10 PURE PRO REV...

Отзывы: