4
Notes:
1.) Center the Fast-Pac injection tube assembly in the duct height.
2.) The injection tubes should pitch back towards the header with a minimum
of 2" per foot of pitch (see above illustration).
3.) Install injection tubes with the orifices injecting upwards.
4.) All condensate drain piping is by others.
Header & Support Bracket Mounting Detail
Fig. 3
Condensate drain connection
(dashed line is the alternate
location - special order)
Cut openings for
supply and drain
connections.
Seal with duct plates
Injection tube
Steam
supply
inlet(s)
2" Pitch per foot
End bracket
mounting bolts
AHU casing or duct wall
Supply/
condensate
header